IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

207

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0956 # 05 Y:2016 05 2016 OPTIMIZE PLANT POWER FACTOR $8,199 $12,220 Not Implemented
UD0956 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,229 $0 Not Implemented
UD0956 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,566 $24,600 Not Implemented
UD0956 # 03 Y:2016 03 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,897 $12,000 Not Implemented
UD0956 # 01 Y:2016 01 2016 INSTALL TURBULATORS $15,641 $5,625 Not Implemented
UD0956 # 11 Y:2016 11 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,070 $2,500 Not Implemented
UD0956 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,421 $14,000 Not Implemented
UD0955 # 09 Y:2016 09 2016 USE RADIANT HEATER FOR SPOT HEATING $3,109 $9,840 Not Implemented
UD0955 # 05 Y:2016 05 2016 COMBINE UTILITY METERS $2,301 $0 Not Implemented
UD0955 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $319 $1,000 Not Implemented
UD0955 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $191 $0 Not Implemented
UD0955 # 03 Y:2016 03 2016 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $15,101 $15,500 Not Implemented
UD0955 # 04 Y:2016 04 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,343 $1,152 Not Implemented
UD0955 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,366 $23,200 Not Implemented
UD0955 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $260 $17 Not Implemented
UD0955 # 08 Y:2016 08 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $4,363 $21,980 Not Implemented
UD0955 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $15,783 $5,438 Not Implemented
UD0954 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $297 $468 Not Implemented
UD0954 # 08 Y:2016 08 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $97 $336 Not Implemented
UD0954 # 06 Y:2016 06 2016 DEVELOP A REPAIR/REPLACE POLICY $1,258 $3,250 Implemented
UD0954 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $3,097 $6,944 Not Implemented
UD0954 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,273 $0 Implemented
UD0954 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,397 $1,000 Not Implemented
UD0954 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,653 $42 Not Implemented
UD0954 # 03 Y:2016 03 2016 UPGRADE CONTROLS ON COMPRESSORS $1,140 $378 Not Implemented