IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,819

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0158 # 02 Y:1985 02 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $434 $280 Implemented
UD0158 # 03 Y:1985 03 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,850 $18,000 Not Implemented
UD0158 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $240 Implemented
UD0160 # 01 Y:1985 01 1985 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $26,076 $20,000 Implemented
UD0160 # 02 Y:1985 02 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,657 $2,000 Implemented
UD0160 # 03 Y:1985 03 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,357 $1,400 Implemented
UD0160 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $280 $200 Implemented
UD0160 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,689 $0 Implemented
UD0160 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,825 $551 Implemented
UD0160 # 07 Y:1985 07 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,401 $7,500 Implemented
UD0153 # 01 Y:1985 01 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,805 $16,000 Not Implemented
UD0153 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,217 $0 Not Implemented
UD0153 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,255 $2,450 Implemented
UD0153 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,666 $16,000 Implemented
UD0154 # 01 Y:1985 01 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $187 $20 Implemented
UD0154 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $593 $54 Implemented
UD0154 # 03 Y:1985 03 1985 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $803 $0 Not Implemented
UD0154 # 04 Y:1985 04 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,569 $3,160 Not Implemented
UD0155 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $6,170 $3,800 Implemented
UD0155 # 02 Y:1985 02 1985 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $6,027 $3,400 Implemented
UD0155 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $947 $483 Implemented
UD0155 # 04 Y:1985 04 1985 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $20,376 $33,000 Not Implemented
UD0156 # 01 Y:1985 01 1985 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,044 $5,000 Not Implemented
UD0156 # 02 Y:1985 02 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $314 $0 Implemented
UD0156 # 03 Y:1985 03 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $319 $130 Implemented