Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
252
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0886 # 14 Y:2013 | 14 | 2013 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $2,995 | $0 | Implemented |
UD0886 # 15 Y:2013 | 15 | 2013 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $9,716 | $30,000 | Not Implemented |
UD0886 # 16 Y:2013 | 16 | 2013 | REDUCE VENTILATION AIR | $32,467 | $20,000 | Not Implemented |
UD0886 # 09 Y:2013 | 09 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $16,109 | $27,000 | Not Implemented |
UD0885 # 07 Y:2013 | 07 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $101,273 | $58,500 | Not Implemented |
UD0885 # 01 Y:2013 | 01 | 2013 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $10,632 | $80,000 | Not Implemented |
UD0885 # 02 Y:2013 | 02 | 2013 | OPTIMIZE PLANT POWER FACTOR | $6,480 | $60,000 | Not Implemented |
UD0885 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,001 | $79,437 | Implemented |
UD0885 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,108 | $14,100 | Not Implemented |
UD0885 # 05 Y:2013 | 05 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $120,105 | $0 | Not Implemented |
UD0885 # 06 Y:2013 | 06 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,143 | $0 | Not Implemented |
UD0885 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,587 | $1,100 | Not Implemented |
UD0885 # 10 Y:2013 | 10 | 2013 | INSULATE BARE EQUIPMENT | $6,356 | $946 | Not Implemented |
UD0885 # 11 Y:2013 | 11 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,958 | $0 | Implemented |
UD0885 # 12 Y:2013 | 12 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $988 | $3,250 | Not Implemented |
UD0885 # 13 Y:2013 | 13 | 2013 | USE SOLAR HEAT TO MAKE ELECTRICTY | $33,106 | $294,000 | Not Implemented |
UD0885 # 08 Y:2013 | 08 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,705 | $3,600 | Not Implemented |
UD0884 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $936 | $500 | Implemented |
UD0884 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,058 | $500 | Implemented |
UD0884 # 07 Y:2013 | 07 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,470 | $0 | Implemented |
UD0884 # 08 Y:2013 | 08 | 2013 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $8,876 | $0 | Implemented |
UD0884 # 11 Y:2013 | 11 | 2013 | AVOID FROST FORMATION ON EVAPORATORS | $1,417 | $0 | Implemented |
UD0884 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,400 | $19,000 | Implemented |
UD0884 # 12 Y:2013 | 12 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,101 | $0 | Implemented |
UD0884 # 09 Y:2013 | 09 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,533 | $2,000 | Implemented |