Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,108
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0901 # 04 Y:2014 | 04 | 2014 | RECOVER AND REUSE COOLING WATER | $221,902 | $100,000 | Implemented |
UD0901 # 05 Y:2014 | 05 | 2014 | REDUCE FLUID FLOW RATES | $151,019 | $100,000 | Implemented |
UD0901 # 06 Y:2014 | 06 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $25,546 | $28,000 | Not Implemented |
UD0901 # 07 Y:2014 | 07 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,426 | $0 | Not Implemented |
UD0901 # 08 Y:2014 | 08 | 2014 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,748 | $1,000 | Not Implemented |
UD0901 # 09 Y:2014 | 09 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $2,267 | $8,850 | Not Implemented |
UD0901 # 10 Y:2014 | 10 | 2014 | REDUCE VENTILATION AIR | $31,388 | $33,025 | Implemented |
UD0901 # 11 Y:2014 | 11 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,379 | $16,055 | Not Implemented |
UD0900 # 01 Y:2014 | 01 | 2014 | REDUCE VENTILATION AIR | $27,790 | $9,213 | Implemented |
UD0900 # 02 Y:2014 | 02 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $14,091 | $200 | Not Implemented |
UD0900 # 03 Y:2014 | 03 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $540 | $1,500 | Implemented |
UD0900 # 04 Y:2014 | 04 | 2014 | INSTALL OCCUPANCY SENSORS | $698 | $170 | Not Implemented |
UD0900 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $583 | $210 | Not Implemented |
UD0900 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $119 | $20 | Not Implemented |
UD0900 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $566 | $0 | Implemented |
UD0900 # 08 Y:2014 | 08 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $565 | $2,500 | Implemented |
UD0900 # 09 Y:2014 | 09 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $332 | $0 | Not Implemented |
UD0899 # 01 Y:2014 | 01 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,057 | $0 | Not Implemented |
UD0899 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $388 | $0 | Implemented |
UD0899 # 03 Y:2014 | 03 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $85 | $0 | Not Implemented |
UD0899 # 04 Y:2014 | 04 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,795 | $4,550 | Not Implemented |
UD0899 # 05 Y:2014 | 05 | 2014 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $2,075 | $0 | Implemented |
UD0899 # 06 Y:2014 | 06 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,303 | $0 | Implemented |
UD0899 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,350 | $7,126 | Not Implemented |
UD0899 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $969 | $2,127 | Implemented |