IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

207

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0944 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $749 $2,640 Not Implemented
UD0944 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $476 $1,148 Not Implemented
UD0944 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $424 $0 Not Implemented
UD0943 # 01 Y:2016 01 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $32,216 $700 Not Implemented
UD0943 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,548 $2,400 Implemented
UD0943 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,300 $0 Implemented
UD0943 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $0 Implemented
UD0943 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $196 $800 Not Implemented
UD0943 # 06 Y:2016 06 2016 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $24,866 $81,180 Not Implemented
UD0943 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,294 $4,525 Not Implemented
UD0943 # 08 Y:2016 08 2016 DEVELOP A REPAIR/REPLACE POLICY $411 $2,031 Not Implemented
UD0943 # 09 Y:2016 09 2016 CONTRACT A WOOD PALLET RECYCLING COMPANY $12,350 $0 Not Implemented
UD0942 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,296 $50 Not Implemented
UD0942 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $245 $35 Not Implemented
UD0942 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $2,012 $810 Not Implemented
UD0942 # 04 Y:2016 04 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,967 $4,500 Not Implemented
UD0942 # 05 Y:2016 05 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,803 $9,350 Not Implemented
UD0942 # 06 Y:2016 06 2016 REDUCE VENTILATION AIR $7,691 $28,200 Not Implemented
UD0942 # 07 Y:2016 07 2016 REDUCE VENTILATION AIR $1,533 $0 Not Implemented
UD0942 # 08 Y:2016 08 2016 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,368 $0 Not Implemented
UD0941 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,010 $4,150 Not Implemented
UD0941 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,653 $0 Implemented
UD0941 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,441 $0 Implemented
UD0941 # 04 Y:2016 04 2016 DEVELOP A REPAIR/REPLACE POLICY $41 $285 Implemented
UD0941 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,109 $4,500 Not Implemented