Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,039
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0888 # 18 Y:2013 | 18 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $21,538 | $2,500 | Not Implemented |
UD0888 # 19 Y:2013 | 19 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $262,538 | $700,000 | Not Implemented |
UD0888 # 20 Y:2013 | 20 | 2013 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $412 | $0 | Implemented |
UD0888 # 21 Y:2013 | 21 | 2013 | CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING | $4,400 | $0 | Implemented |
UD0887 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,553 | $50 | Implemented |
UD0887 # 02 Y:2013 | 02 | 2013 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,438 | $0 | Implemented |
UD0887 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $497 | $500 | Implemented |
UD0887 # 04 Y:2013 | 04 | 2013 | INSTALL SPECTRAL REFLECTORS / DELAMP | $8,763 | $2,075 | Implemented |
UD0887 # 05 Y:2013 | 05 | 2013 | ADD AREA LIGHTING SWITCHES | $3,141 | $350 | Not Implemented |
UD0887 # 06 Y:2013 | 06 | 2013 | ADD AREA LIGHTING SWITCHES | $594 | $350 | Implemented |
UD0887 # 07 Y:2013 | 07 | 2013 | OPTIMIZE PLANT POWER FACTOR | $19,173 | $10,000 | Not Implemented |
UD0887 # 08 Y:2013 | 08 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,244 | $0 | Not Implemented |
UD0887 # 09 Y:2013 | 09 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,136 | $4,000 | Not Implemented |
UD0887 # 10 Y:2013 | 10 | 2013 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $187 | $300 | Not Implemented |
UD0887 # 11 Y:2013 | 11 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $2,637 | $3,420 | Implemented |
UD0887 # 12 Y:2013 | 12 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $500 | $0 | Not Implemented |
UD0887 # 13 Y:2013 | 13 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $383 | $0 | Implemented |
UD0886 # 01 Y:2013 | 01 | 2013 | MINIMIZE WATER USAGE | $32,244 | $1,000 | Not Implemented |
UD0886 # 02 Y:2013 | 02 | 2013 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,317 | $1,000 | Not Implemented |
UD0886 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,238 | $7,500 | Not Implemented |
UD0886 # 04 Y:2013 | 04 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $20,782 | $50,000 | Not Implemented |
UD0886 # 05 Y:2013 | 05 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,028 | $0 | Not Implemented |
UD0886 # 06 Y:2013 | 06 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,761 | $0 | Not Implemented |
UD0886 # 07 Y:2013 | 07 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $36,728 | $14,900 | Implemented |
UD0886 # 08 Y:2013 | 08 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $4,035 | $3,550 | Not Implemented |