IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

251

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0752 # 02 Y:2006 02 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,542 $0 Implemented
UD0752 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,557 $0 Implemented
UD0752 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,473 $40,463 Implemented
UD0752 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,592 $0 Implemented
UD0752 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,798 $225 Implemented
UD0751 # 05 Y:2006 05 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $13,248 $10,000 Not Implemented
UD0751 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,066 $28,800 Not Implemented
UD0751 # 03 Y:2006 03 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $32,112 $0 Not Implemented
UD0751 # 08 Y:2006 08 2006 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $8,395 $2,000 Not Implemented
UD0751 # 07 Y:2006 07 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,000 $0 Not Implemented
UD0751 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $63,687 $0 Implemented
UD0751 # 04 Y:2006 04 2006 OPTIMIZE PLANT POWER FACTOR $21,149 $61,500 Not Implemented
UD0751 # 01 Y:2006 01 2006 REDUCE EXCESS STEAM BLEEDING $90,000 $18,000 Not Implemented
UD0751 # 10 Y:2006 10 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,759 $5,000 Implemented
UD0751 # 09 Y:2006 09 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,062 $12,000 Not Implemented
UD0750 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,020 $135,999 Not Implemented
UD0750 # 09 Y:2006 09 2006 REPAIR AND ELIMINATE STEAM LEAKS $24,000 $13,000 Implemented
UD0750 # 01 Y:2006 01 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $273,386 $100,000 Not Implemented
UD0750 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $226,890 $120,000 Implemented
UD0750 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $79,000 $45,000 Implemented
UD0750 # 03 Y:2006 03 2006 REPAIR OR REPLACE STEAM TRAPS $155,000 $187,200 Implemented
UD0750 # 10 Y:2006 10 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,730 $20,000 Not Implemented
UD0750 # 06 Y:2006 06 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $44,000 $25,000 Implemented
UD0750 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $56,000 $0 Not Implemented
UD0750 # 07 Y:2006 07 2006 USE OPTIMUM THICKNESS INSULATION $41,225 $39,892 Not Implemented