Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
167
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1025 # 07 Y:2020 | 07 | 2020 | OPTIMIZE PLANT POWER FACTOR | $3,612 | $7,325 | Not Implemented |
UD1025 # 09 Y:2020 | 09 | 2020 | INSTALL OCCUPANCY SENSORS | $11,875 | $4,845 | Not Implemented |
UD1025 # 01 Y:2020 | 01 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,747 | $0 | Not Implemented |
UD1025 # 06 Y:2020 | 06 | 2020 | COMBINE UTILITY METERS | $8,278 | $0 | Not Implemented |
UD1025 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,051 | $340 | Implemented |
UD1025 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $83,809 | $25,133 | Not Implemented |
UD1025 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,963 | $26,366 | Not Implemented |
UD1025 # 05 Y:2020 | 05 | 2020 | REDUCE EXCESSIVE BOILER BLOWDOWN | $6,710 | $5,224 | Not Implemented |
UD1025 # 10 Y:2020 | 10 | 2020 | INSTALL EQUIPMENT TO MOVE PRODUCT | $454,408 | $375,000 | Not Implemented |
UD1025 # 03 Y:2020 | 03 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,411 | $4,000 | Not Implemented |
UD1024 # 03 Y:2020 | 03 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $37,324 | $1,300 | Not Implemented |
UD1024 # 04 Y:2020 | 04 | 2020 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $15,421 | $0 | Not Implemented |
UD1024 # 06 Y:2020 | 06 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $52,582 | $24,500 | Not Implemented |
UD1024 # 01 Y:2020 | 01 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $454 | $0 | Not Implemented |
UD1024 # 10 Y:2020 | 10 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,326 | $30,000 | Not Implemented |
UD1024 # 07 Y:2020 | 07 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,282 | $28,000 | Not Implemented |
UD1024 # 05 Y:2020 | 05 | 2020 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $921,416 | $672,400 | Not Implemented |
UD1024 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,759 | $10,650 | Implemented |
UD1024 # 11 Y:2020 | 11 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $636 | $0 | Implemented |
UD1024 # 02 Y:2020 | 02 | 2020 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $44,273 | $40,000 | Not Implemented |
UD1024 # 09 Y:2020 | 09 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $40,609 | $80,500 | Not Implemented |
UD1023 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $33,329 | $14,912 | Not Implemented |
UD1023 # 03 Y:2020 | 03 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $163 | $0 | Not Implemented |
UD1023 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,341 | $0 | Not Implemented |
UD1023 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,275 | $3,000 | Not Implemented |