IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

149

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0769 # 11 Y:2007 11 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,569 $3,275 Implemented
UD0769 # 13 Y:2007 13 2007 UPGRADE CONTROLS ON COMPRESSORS $3,980 $0 Implemented
UD0769 # 14 Y:2007 14 2007 REDUCE VENTILATION AIR $2,208 $590 Implemented
UD0769 # 15 Y:2007 15 2007 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,800 $500 Implemented
UD0769 # 16 Y:2007 16 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,447 $520 Implemented
UD0769 # 17 Y:2007 17 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $1,242 $0 Implemented
UD0646 # 01 Y:2002 01 2002 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $33,646 $32,000 Implemented
UD0646 # 02 Y:2002 02 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $25,468 $12,700 Implemented
UD0646 # 04 Y:2002 04 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,685 $2,000 Implemented
UD0646 # 10 Y:2002 10 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $379 $499 Implemented
UD0495 # 01 Y:1996 01 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,063 $6,000 Implemented
UD0495 # 02 Y:1996 02 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,867 $0 Implemented
UD0495 # 03 Y:1996 03 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,571 $0 Implemented
UD0495 # 05 Y:1996 05 1996 USE POWER DURING OFF-PEAK PERIODS $24,538 $0 Implemented
UD0479 # 01 Y:1995 01 1995 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,667 $0 Implemented
UD0479 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,043 $16,000 Implemented
UD0479 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,152 $17,500 Implemented
UD0479 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,184 $14,654 Implemented
UD0468 # 03 Y:1995 03 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,738 $1,000 Implemented
UD0468 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,406 $30,850 Implemented
UD0468 # 05 Y:1995 05 1995 DISCONNECT BALLASTS $3,368 $3,000 Implemented
UD0436 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $11,729 $21,000 Implemented
UD0436 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $4,381 $7,000 Implemented
UD0436 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,299 $15,139 Implemented
UD0433 # 02 Y:1994 02 1994 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,410 $0 Implemented