IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1015 # 10 Y:2020 10 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,410 $28,400 Not Implemented
UD1015 # 09 Y:2020 09 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,052 $1,854 Not Implemented
UD1015 # 06 Y:2020 06 2020 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,958 $0 Not Implemented
UD1015 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,442 $86,373 Not Implemented
UD1015 # 04 Y:2020 04 2020 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $769 $1,080 Not Implemented
UD1015 # 02 Y:2020 02 2020 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,248 $309 Not Implemented
UD1015 # 07 Y:2020 07 2020 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $6,591 $0 Implemented
UD1015 # 05 Y:2020 05 2020 USE MULTIPLE-EFFECT EVAPORATORS $18,945 $26,742 Not Implemented
UD1015 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,207 $0 Implemented
UD1015 # 03 Y:2020 03 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,267 $0 Implemented
UD0982 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,415 $0 Implemented
UD0982 # 08 Y:2018 08 2018 COVER OPEN TANKS $700 $460 Not Implemented
UD0982 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,501 $8,000 Implemented
UD0982 # 07 Y:2018 07 2018 COVER OPEN TANKS $268 $0 Not Implemented
UD0982 # 13 Y:2018 13 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $13,372 $10,000 Implemented
UD0982 # 12 Y:2018 12 2018 ADD AREA LIGHTING SWITCHES $675 $500 Implemented
UD0982 # 11 Y:2018 11 2018 INSTALL OCCUPANCY SENSORS $5,167 $1,500 Implemented
UD0982 # 10 Y:2018 10 2018 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,443 $0 Implemented
UD0982 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,311 $113,386 Not Implemented
UD0982 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,208 $3,500 Implemented
UD0982 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,010 $500 Implemented
UD0982 # 02 Y:2018 02 2018 REDUCE VENTILATION AIR $9,420 $3,000 Implemented
UD0982 # 01 Y:2018 01 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,886 $0 Implemented
UD0981 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,343 $5,021 Not Implemented
UD0981 # 07 Y:2018 07 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,343 $5,021 Not Implemented