Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,848
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0626 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,036 | $15,920 | n/a |
UF0626 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,328 | $1,140 | n/a |
UF0626 # 05 Y:2024 | 05 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,655 | $12,290 | n/a |
UF0626 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,871 | $0 | n/a |
UF0626 # 11 Y:2024 | 11 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $25,597 | $60,000 | n/a |
UF0626 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,710 | $322,608 | n/a |
UF0626 # 08 Y:2024 | 08 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $1,107 | $280 | n/a |
UF0626 # 09 Y:2024 | 09 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $75,600 | $740 | n/a |
UF0626 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $41,281 | $36,971 | n/a |
UF0626 # 10 Y:2024 | 10 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $57,669 | $2,320 | n/a |
UF0626 # 07 Y:2024 | 07 | 2024 | REDESIGN PROCESS | $1,168 | $4,600 | n/a |
UF0625 # 09 Y:2024 | 09 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $31,920 | $804 | n/a |
UF0625 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $710 | $0 | n/a |
UF0625 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,573 | $3,962 | n/a |
UF0625 # 08 Y:2024 | 08 | 2024 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $68,287 | $300,000 | n/a |
UF0625 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,440 | $6,188 | n/a |
UF0625 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $51,273 | $322,608 | n/a |
UF0625 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,082 | $469 | n/a |
UF0625 # 10 Y:2024 | 10 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $9,256 | $2,512 | n/a |
UF0625 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $33,462 | $12,390 | n/a |
UF0625 # 03 Y:2024 | 03 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,895 | $5,801 | n/a |
UF0624 # 03 Y:2024 | 03 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $11,217 | $21,658 | n/a |
UF0624 # 08 Y:2024 | 08 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $23,221 | $60,000 | n/a |
UF0624 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,280 | $0 | n/a |
UF0624 # 02 Y:2024 | 02 | 2024 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $20,908 | $14,359 | n/a |