Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
62
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0632 # 06 Y:2025 | 06 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $4,200 | $2,000 | n/a |
UF0632 # 05 Y:2025 | 05 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,526 | $20,560 | n/a |
UF0632 # 13 Y:2025 | 13 | 2025 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $1,094 | $0 | n/a |
UF0632 # 10 Y:2025 | 10 | 2025 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $2,684 | $2,743 | n/a |
UF0632 # 04 Y:2025 | 04 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,726 | $12,000 | n/a |
UF0632 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,911 | $34,076 | n/a |
UF0632 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,772 | $20,202 | n/a |
UF0632 # 14 Y:2025 | 14 | 2025 | IMPROVE SPACE COMFORT CONDITIONING | $1,115 | $3,888 | n/a |
UF0632 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $43,631 | $322,608 | n/a |
UF0632 # 12 Y:2025 | 12 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $7,429 | $20,000 | n/a |
UF0632 # 08 Y:2025 | 08 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,170 | $2,654 | n/a |
UF0632 # 09 Y:2025 | 09 | 2025 | INSTALL TURBULATORS | $2,277 | $3,750 | n/a |
UF0632 # 07 Y:2025 | 07 | 2025 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $4,170 | $6,785 | n/a |
UF0632 # 11 Y:2025 | 11 | 2025 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $3,839 | $3,079 | n/a |
UF0631 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,201 | $0 | n/a |
UF0631 # 06 Y:2025 | 06 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $1,095 | $4,000 | n/a |
UF0631 # 04 Y:2025 | 04 | 2025 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,216 | $4,665 | n/a |
UF0631 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,030 | $500 | n/a |
UF0631 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $30,505 | $15,454 | n/a |
UF0631 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,516 | $322,608 | n/a |
UF0631 # 07 Y:2025 | 07 | 2025 | IMPROVE SPACE COMFORT CONDITIONING | $65,876 | $2,873 | n/a |
UF0631 # 08 Y:2025 | 08 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $45,000 | $1,900 | n/a |
UF0630 # 11 Y:2025 | 11 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $11,572 | $20,000 | n/a |
UF0630 # 04 Y:2025 | 04 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $10,115 | $2,000 | n/a |
UF0630 # 03 Y:2025 | 03 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $12,224 | $8,907 | n/a |