Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
151
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0271 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $1,412 | $828 | Not Implemented |
UM0271 # 07 Y:2004 | 07 | 2004 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,064 | $1,921 | Not Implemented |
UM0271 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,777 | $975 | Not Implemented |
UM0271 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,485 | $27,143 | Not Implemented |
UM0271 # 04 Y:2004 | 04 | 2004 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $24,731 | $30,000 | Not Implemented |
UM0271 # 03 Y:2004 | 03 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $46,000 | $46,000 | Not Implemented |
UM0271 # 02 Y:2004 | 02 | 2004 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $145,057 | $125,000 | Not Implemented |
UM0271 # 01 Y:2004 | 01 | 2004 | BURN A LESS EXPENSIVE GRADE OF FUEL | $542,255 | $2,000,000 | Not Implemented |
UM0265 # 08 Y:2004 | 08 | 2004 | COVER OPEN TANKS | $855 | $1,500 | Not Implemented |
UM0265 # 07 Y:2004 | 07 | 2004 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,652 | $250 | Not Implemented |
UM0265 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,069 | $975 | Not Implemented |
UM0265 # 05 Y:2004 | 05 | 2004 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $6,581 | $10,000 | n/a |
UM0265 # 04 Y:2004 | 04 | 2004 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $11,886 | $30,000 | n/a |
UM0265 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,733 | $15,532 | n/a |
UM0265 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $30,525 | $30,000 | n/a |
UM0265 # 01 Y:2004 | 01 | 2004 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $105,689 | $64,000 | n/a |
UM0264 # 06 Y:2004 | 06 | 2004 | INSULATE BARE EQUIPMENT | $1,281 | $509 | Not Implemented |
UM0264 # 01 Y:2004 | 01 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $47,250 | $2,600 | Implemented |
UM0264 # 02 Y:2004 | 02 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,340 | $12,530 | n/a |
UM0264 # 03 Y:2004 | 03 | 2004 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $7,700 | $800 | Not Implemented |
UM0264 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,653 | $9,433 | Not Implemented |
UM0264 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $2,270 | $5,610 | Not Implemented |
UM0264 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $312 | $200 | Not Implemented |
UM0264 # 08 Y:2004 | 08 | 2004 | COVER OPEN TANKS | $379 | $500 | Not Implemented |
UM0264 # 07 Y:2004 | 07 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,670 | $500 | Not Implemented |