Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0473 # 08 Y:2016 | 08 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,901 | $10,265 | n/a |
UM0473 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,291 | $23,462 | n/a |
UM0473 # 05 Y:2016 | 05 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,899 | $2,835 | n/a |
UM0473 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,566 | $1,000 | n/a |
UM0473 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $2,449 | $630 | n/a |
UM0473 # 02 Y:2016 | 02 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,050 | $1,000 | n/a |
UM0473 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $6,129 | $15,000 | n/a |
UM0473 # 04 Y:2016 | 04 | 2016 | COVER OPEN TANKS | $52,272 | $2,335 | n/a |
UM0472 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,915 | $12,000 | n/a |
UM0472 # 03 Y:2016 | 03 | 2016 | ADD AREA LIGHTING SWITCHES | $22,157 | $2,680 | n/a |
UM0472 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,743 | $18,830 | n/a |
UM0472 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,171 | $1,000 | n/a |
UM0471 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,290 | $500 | n/a |
UM0471 # 05 Y:2016 | 05 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,664 | $3,435 | n/a |
UM0471 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,519 | $5,500 | n/a |
UM0471 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $696 | $2,500 | n/a |
UM0471 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $1,462 | $1,750 | n/a |
UM0470 # 04 Y:2016 | 04 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $819 | $3,700 | n/a |
UM0470 # 03 Y:2016 | 03 | 2016 | INSTALL OCCUPANCY SENSORS | $1,272 | $2,500 | n/a |
UM0470 # 02 Y:2016 | 02 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,012 | $5,000 | n/a |
UM0470 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,893 | $2,000 | n/a |
UM0469 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,415 | $1,500 | Not Implemented |
UM0469 # 03 Y:2016 | 03 | 2016 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $7,961 | $20,000 | Not Implemented |
UM0469 # 02 Y:2016 | 02 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,118 | $5,200 | Not Implemented |
UM0469 # 05 Y:2016 | 05 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $601 | $1,000 | Not Implemented |