Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
110
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0251 # 02 Y:2024 | 02 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $27,500 | $13,788 | n/a |
UU0251 # 05 Y:2024 | 05 | 2024 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $8,918 | $750 | n/a |
UU0251 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,830 | $19,570 | n/a |
UU0251 # 01 Y:2024 | 01 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $38,394 | $100,000 | n/a |
UU0251 # 03 Y:2024 | 03 | 2024 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $23,190 | $1,500 | n/a |
UU0251 # 07 Y:2024 | 07 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,290 | $5,750 | n/a |
UU0251 # 08 Y:2024 | 08 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $180 | $300 | n/a |
UU0251 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,210 | $6,486 | n/a |
UU0253 # 01 Y:2024 | 01 | 2024 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $26,630 | $43,200 | n/a |
UU0253 # 03 Y:2024 | 03 | 2024 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $22,211 | $18,400 | n/a |
UU0253 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,113 | $26,430 | n/a |
UU0252 # 01 Y:2024 | 01 | 2024 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $19,754 | $108,000 | n/a |
UU0252 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,880 | $5,500 | n/a |
UU0252 # 02 Y:2024 | 02 | 2024 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $53,389 | $212,000 | n/a |
UU0253 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $717 | $2,200 | n/a |
UU0252 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,070 | $4,410 | n/a |
UU0253 # 05 Y:2024 | 05 | 2024 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $150 | $450 | n/a |
UU0248 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $940 | $3,000 | n/a |
UU0248 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,740 | $1,270 | n/a |
UU0248 # 05 Y:2024 | 05 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,380 | $133,800 | n/a |
UU0248 # 03 Y:2024 | 03 | 2024 | USE AUTOMATIC FLOW CONTROL | $820 | $4,250 | n/a |
UU0248 # 04 Y:2024 | 04 | 2024 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $33,420 | $319,250 | n/a |
UU0248 # 07 Y:2024 | 07 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,570 | $9,360 | n/a |
UU0248 # 01 Y:2024 | 01 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $980 | $2,600 | n/a |
UU0247 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $864 | $7,540 | n/a |