Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,569
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0156 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $3,874 | $3,125 | Implemented |
UU0155 # 01 Y:2019 | 01 | 2019 | ADOPT IN-HOUSE MATERIAL GENERATION | $102,278 | $823,000 | Implemented |
UU0155 # 02 Y:2019 | 02 | 2019 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $14,015 | $46,625 | Not Implemented |
UU0155 # 03 Y:2019 | 03 | 2019 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $898 | $1,650 | Implemented |
UU0154 # 01 Y:2019 | 01 | 2019 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $567,696 | $2,355,000 | Not Implemented |
UU0154 # 02 Y:2019 | 02 | 2019 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $262,908 | $2,299,950 | Not Implemented |
UU0154 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $170,761 | $461,313 | Implemented |
UU0154 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,288 | $2,040 | Implemented |
UU0154 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $10,215 | $3,044 | Implemented |
UU0154 # 06 Y:2019 | 06 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,947 | $2,000 | Not Implemented |
UU0153 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $48,728 | $423,632 | Not Implemented |
UU0153 # 02 Y:2019 | 02 | 2019 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $14,902 | $205,000 | Implemented |
UU0153 # 03 Y:2019 | 03 | 2019 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $22,776 | $146,977 | Not Implemented |
UU0153 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $5,443 | $502 | Not Implemented |
UU0153 # 05 Y:2019 | 05 | 2019 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $2,777 | $6,500 | Implemented |
UU0153 # 06 Y:2019 | 06 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $899 | $2,019 | Implemented |
UU0153 # 07 Y:2019 | 07 | 2019 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,444 | $400 | Implemented |
UU0150 # 01 Y:2019 | 01 | 2019 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $20,467 | $29,138 | Implemented |
UU0150 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,018 | $6,202 | Implemented |
UU0150 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,551 | $23,008 | Not Implemented |
UU0150 # 04 Y:2019 | 04 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,605 | $15,000 | Not Implemented |
UU0150 # 05 Y:2019 | 05 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,756 | $21,565 | Not Implemented |
UU0150 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $5,042 | $5,250 | Implemented |
UU0150 # 07 Y:2019 | 07 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,861 | $0 | Implemented |
UU0150 # 08 Y:2019 | 08 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,762 | $3,762 | Not Implemented |