IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,531

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0089 # 02 Y:2005 02 2005 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,820 $1,500 Not Implemented
UU0089 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,940 $21,000 Not Implemented
UU0089 # 04 Y:2005 04 2005 AIR CONDITION ONLY SPACE NECESSARY $33,020 $2,085 Not Implemented
UU0089 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,700 $2,000 Implemented
UU0096 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $840 $330 Not Implemented
UU0096 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,320 $5,000 Not Implemented
UU0096 # 03 Y:2005 03 2005 USE PHOTOCELL CONTROLS $2,530 $2,040 Not Implemented
UU0096 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $3,320 $1,950 Not Implemented
UU0096 # 05 Y:2005 05 2005 RECOVER AND REUSE WASTE MATERIAL $9,000 $0 Not Implemented
UU0095 # 01 Y:2005 01 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,360 $2,000 Implemented
UU0095 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,800 $20,000 Not Implemented
UU0095 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,985 $40,000 Not Implemented
UU0095 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $710 $305 Not Implemented
UU0095 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $7,720 $450 Not Implemented
UU0094 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,140 $380 Not Implemented
UU0094 # 02 Y:2005 02 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,260 $7,000 Not Implemented
UU0094 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $370 $220 Not Implemented
UU0094 # 04 Y:2005 04 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,540 $0 Not Implemented
UU0094 # 05 Y:2005 05 2005 USE OPTIMUM THICKNESS INSULATION $110 $150 Not Implemented
UU0093 # 01 Y:2005 01 2005 $336,460 $336,000 Not Implemented
UU0093 # 02 Y:2005 02 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $727 $495 Not Implemented
UU0093 # 03 Y:2005 03 2005 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $350 $2,000 Not Implemented
UU0093 # 04 Y:2005 04 2005 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $19,080 $0 Not Implemented
UU0093 # 05 Y:2005 05 2005 PAY UTILITY BILLS ON TIME $1,418 $0 Not Implemented
UU0093 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $777 $2,000 Not Implemented