Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
430
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2403 # 07 Y:2024 | 07 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $8,794 | $58,500 | n/a |
UW2403 # 01 Y:2024 | 01 | 2024 | INSULATE BARE EQUIPMENT | $8,480 | $4,010 | n/a |
UW2403 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,147 | $4,257 | n/a |
UW2403 # 08 Y:2024 | 08 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $24,078 | $36,400 | n/a |
UW2403 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,988 | $1,080 | n/a |
UW2403 # 06 Y:2024 | 06 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $6,846 | $30,000 | n/a |
UW2403 # 03 Y:2024 | 03 | 2024 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $222,893 | $500,000 | n/a |
UW2403 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,319 | $720 | n/a |
UW2402 # 08 Y:2024 | 08 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,076 | $311,400 | n/a |
UW2402 # 04 Y:2024 | 04 | 2024 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $55,000 | $117,000 | n/a |
UW2402 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $282 | $1,742 | n/a |
UW2402 # 02 Y:2024 | 02 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,045 | $582 | n/a |
UW2402 # 05 Y:2024 | 05 | 2024 | USE OTHER WASTE CONCENTRATION METHODS | $25,000 | $104,000 | n/a |
UW2402 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,442 | $5,083 | n/a |
UW2402 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO HEAT WATER | $13,327 | $84,652 | n/a |
UW2402 # 06 Y:2024 | 06 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $17,310 | $375 | n/a |
UW2401 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $6,204 | $23,347 | n/a |
UW2401 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,711 | $4,441 | n/a |
UW2401 # 06 Y:2024 | 06 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $26,650 | $58,013 | n/a |
UW2401 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,688 | $3,000 | n/a |
UW2401 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,098 | $26,080 | n/a |
UW2401 # 01 Y:2024 | 01 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $141,044 | $149,500 | n/a |
UW2319 # 06 Y:2023 | 06 | 2023 | USER BATTERY STORAGE FOR POWER QUALITY ISSUES | $750,000 | $871,000 | n/a |
UW2319 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,789 | $3,000 | n/a |
UW2319 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,837 | $2,080 | n/a |