Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
249
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2402 # 08 Y:2024 | 08 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,076 | $311,400 | Implemented |
UW2402 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO HEAT WATER | $13,327 | $84,652 | Implemented |
UW2402 # 06 Y:2024 | 06 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $17,310 | $375 | Implemented |
UW2402 # 05 Y:2024 | 05 | 2024 | USE OTHER WASTE CONCENTRATION METHODS | $25,000 | $104,000 | Implemented |
UW2402 # 04 Y:2024 | 04 | 2024 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $55,000 | $117,000 | Implemented |
UW2402 # 02 Y:2024 | 02 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,045 | $582 | Implemented |
UW2402 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,442 | $5,083 | Implemented |
UW2401 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,688 | $3,000 | Implemented |
UW2401 # 01 Y:2024 | 01 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $141,044 | $149,500 | Implemented |
UW2401 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,711 | $4,441 | Implemented |
UW2401 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,098 | $26,080 | Implemented |
UW2401 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $6,204 | $23,347 | Implemented |
UW2401 # 06 Y:2024 | 06 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $26,650 | $58,013 | Implemented |
UW2318 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $67 | $180 | Implemented |
UW2318 # 01 Y:2023 | 01 | 2023 | RECOVER AND REUSE COOLING WATER | $345,363 | $28,215 | Implemented |
UW2317 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $533 | $0 | Implemented |
UW2317 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $658 | $1,096 | Implemented |
UW2317 # 03 Y:2023 | 03 | 2023 | INSTALL STORM WINDOWS AND DOORS | $156 | $1,901 | Implemented |
UW2317 # 05 Y:2023 | 05 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $30,104 | $300,000 | Implemented |
UW2317 # 04 Y:2023 | 04 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $31,756 | $1,000,000 | Implemented |
UW2316 # 02 Y:2023 | 02 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $73,471 | $88,000 | Implemented |
UW2316 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $705 | $2,080 | Implemented |
UW2315 # 02 Y:2023 | 02 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $30,104 | $300,000 | Implemented |
UW2315 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,189 | $1,896 | Implemented |
UW2314 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $96 | $180 | Implemented |