Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,298
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0465 # 08 Y:2004 | 08 | 2004 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $727 | $0 | Not Implemented |
WI0464 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,751 | $48,510 | n/a |
WI0464 # 02 Y:2004 | 02 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $3,969 | $6,500 | Not Implemented |
WI0464 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,856 | $0 | Implemented |
WI0464 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,860 | $1,000 | Implemented |
WI0464 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,256 | $428 | Not Implemented |
WI0464 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $468 | $0 | Not Implemented |
WI0464 # 07 Y:2004 | 07 | 2004 | INSTALL AUTOMATIC STACK DAMPER | $409 | $1,800 | Not Implemented |
WI0464 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $149 | $149 | Not Implemented |
WI0461 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,591 | $14,685 | n/a |
WI0461 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,032 | $360 | Implemented |
WI0461 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $475 | $0 | Not Implemented |
WI0461 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,930 | $5,784 | Not Implemented |
WI0461 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,681 | $1,227 | Not Implemented |
WI0463 # 01 Y:2004 | 01 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $75,927 | $18,500 | Not Implemented |
WI0463 # 02 Y:2004 | 02 | 2004 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $17,690 | $17,690 | Not Implemented |
WI0463 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,360 | $2,000 | Not Implemented |
WI0463 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,859 | $29,148 | Not Implemented |
WI0463 # 05 Y:2004 | 05 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $11,920 | $12,595 | Not Implemented |
WI0463 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,605 | $840 | Not Implemented |
WI0463 # 07 Y:2004 | 07 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,530 | $15,200 | Not Implemented |
WI0459 # 01 Y:2004 | 01 | 2004 | USE OPTIMUM TEMPERATURE | $17,598 | $4,500 | Not Implemented |
WI0459 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,519 | $26,871 | n/a |
WI0459 # 03 Y:2004 | 03 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $11,712 | $11,250 | n/a |
WI0459 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $340 | $640 | Implemented |