Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,298
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0459 # 05 Y:2004 | 05 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $323 | $1,206 | Not Implemented |
WI0462 # 01 Y:2004 | 01 | 2004 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $30,420 | $36,000 | Not Implemented |
WI0462 # 02 Y:2004 | 02 | 2004 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $8,389 | $14,000 | Not Implemented |
WI0462 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,916 | $8,000 | Not Implemented |
WI0462 # 04 Y:2004 | 04 | 2004 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,136 | $1,800 | Not Implemented |
WI0462 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,319 | $500 | Not Implemented |
WI0462 # 06 Y:2004 | 06 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $808 | $2,500 | Not Implemented |
WI0462 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $798 | $840 | Not Implemented |
WI0462 # 08 Y:2004 | 08 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $369 | $438 | Not Implemented |
WI0460 # 01 Y:2004 | 01 | 2004 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $65,381 | $260,000 | Not Implemented |
WI0460 # 02 Y:2004 | 02 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,848 | $6,708 | Implemented |
WI0460 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,616 | $17,980 | Implemented |
WI0460 # 04 Y:2004 | 04 | 2004 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $5,350 | $10,000 | n/a |
WI0458 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,180 | $17,325 | Implemented |
WI0458 # 02 Y:2004 | 02 | 2004 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $6,420 | $18,000 | Implemented |
WI0458 # 03 Y:2004 | 03 | 2004 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $4,400 | $3,500 | Implemented |
WI0458 # 04 Y:2004 | 04 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $3,959 | $7,900 | Implemented |
WI0458 # 05 Y:2004 | 05 | 2004 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $1,980 | $0 | Not Implemented |
WI0458 # 06 Y:2004 | 06 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $1,707 | $3,500 | Not Implemented |
WI0458 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,053 | $740 | Not Implemented |
WI0457 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $7,805 | $11,000 | Not Implemented |
WI0457 # 02 Y:2003 | 02 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,965 | $800 | Not Implemented |
WI0457 # 03 Y:2003 | 03 | 2003 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $3,333 | $8,000 | Not Implemented |
WI0457 # 04 Y:2003 | 04 | 2003 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $1,413 | $0 | Not Implemented |
WI0457 # 05 Y:2003 | 05 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $936 | $200 | Not Implemented |