IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,298

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0445 # 01 Y:2003 01 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $4,725 $0 Implemented
WI0445 # 02 Y:2003 02 2003 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $3,022 $10,000 n/a
WI0445 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,188 $4,400 Not Implemented
WI0445 # 04 Y:2003 04 2003 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,188 $1,000 Not Implemented
WI0445 # 05 Y:2003 05 2003 UPGRADE CONTROLS ON COMPRESSORS $1,111 $2,500 Not Implemented
WI0445 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $422 $640 Implemented
WI0444 # 01 Y:2003 01 2003 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $6,597 $9,000 Implemented
WI0444 # 02 Y:2003 02 2003 UPGRADE CONTROLS ON COMPRESSORS $4,807 $7,500 Not Implemented
WI0444 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,189 $8,655 Implemented
WI0444 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,383 $2,000 Not Implemented
WI0444 # 05 Y:2003 05 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,301 $1,424 Not Implemented
WI0444 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $983 $740 Implemented
WI0444 # 07 Y:2003 07 2003 INSTALL TIMERS AND/OR THERMOSTATS $683 $600 Not Implemented
WI0443 # 01 Y:2003 01 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,583 $9,000 Implemented
WI0443 # 02 Y:2003 02 2003 REDUCE EXCESSIVE BOILER BLOWDOWN $1,964 $4,500 Implemented
WI0443 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,215 $500 Implemented
WI0443 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $843 $2,500 Not Implemented
WI0443 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $421 $640 Implemented
WI0443 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $341 $75 Implemented
WI0442 # 01 Y:2003 01 2003 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $188,665 $146,300 Not Implemented
WI0442 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,332 $6,498 Not Implemented
WI0442 # 03 Y:2003 03 2003 USE POWER DURING OFF-PEAK PERIODS $5,132 $0 Not Implemented
WI0442 # 04 Y:2003 04 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,640 $10,000 Not Implemented
WI0442 # 05 Y:2003 05 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,559 $500 Not Implemented
WI0441 # 01 Y:2003 01 2003 INCREASE USE OF AUTOMATION $66,563 $30,000 Not Implemented