IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,298

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0415 # 04 Y:2002 04 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,616 $0 Not Implemented
WI0415 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,252 $1,086 Implemented
WI0415 # 06 Y:2002 06 2002 REPLACE CLOTH RAGS WITH PAPER TOWELS $737 $0 Not Implemented
WI0415 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $307 $68 Implemented
WI0414 # 01 Y:2002 01 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,469 $1,800 Not Implemented
WI0414 # 02 Y:2002 02 2002 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $6,619 $14,000 Not Implemented
WI0414 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,225 $0 Implemented
WI0414 # 04 Y:2002 04 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,730 $0 Implemented
WI0414 # 05 Y:2002 05 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,560 $1,033 Not Implemented
WI0414 # 06 Y:2002 06 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,971 $0 Not Implemented
WI0414 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $1,071 $2,400 Implemented
WI0414 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $754 $350 Implemented
WI0413 # 01 Y:2002 01 2002 INSTALL SOLID WASTE INCINERATOR FOR HEAT $27,075 $130,000 Not Implemented
WI0413 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,951 $3,762 Not Implemented
WI0413 # 03 Y:2002 03 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,493 $600 Not Implemented
WI0413 # 04 Y:2002 04 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $6,626 $26,500 n/a
WI0413 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,732 $25,405 n/a
WI0413 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $928 $640 Implemented
WI0412 # 01 Y:2002 01 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,881 $1,200 Implemented
WI0412 # 02 Y:2002 02 2002 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $8,966 $11,000 Not Implemented
WI0412 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,780 $0 Not Implemented
WI0412 # 04 Y:2002 04 2002 DISTILL CONTAMINATED SOLVENTS FOR REUSE $3,383 $10,000 n/a
WI0412 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,774 $90 Implemented
WI0412 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $1,656 $9,500 Not Implemented
WI0412 # 07 Y:2002 07 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,047 $1,050 Implemented