IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,298

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0388 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $613 $562 Not Implemented
WI0388 # 07 Y:2001 07 2001 INSTALL TIMERS AND/OR THERMOSTATS $336 $200 Not Implemented
WI0388 # 08 Y:2001 08 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $190 $0 Not Implemented
WI0387 # 01 Y:2001 01 2001 IMPROVE SPACE COMFORT CONDITIONING $178,421 $400,000 n/a
WI0387 # 02 Y:2001 02 2001 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $24,138 $0 Implemented
WI0387 # 03 Y:2001 03 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $9,794 $0 Implemented
WI0387 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,726 $1,994 Implemented
WI0387 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $712 $2,050 Not Implemented
WI0387 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $418 $300 Implemented
WI0387 # 07 Y:2001 07 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $8,770 $16,000 Implemented
WI0387 # 08 Y:2001 08 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,292 $0 Not Implemented
WI0387 # 09 Y:2001 09 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $630 $640 Implemented
WI0387 # 10 Y:2001 10 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $387 $90 Implemented
WI0386 # 01 Y:2001 01 2001 DISTILL CONTAMINATED SOLVENTS FOR REUSE $27,904 $20,000 Not Implemented
WI0386 # 02 Y:2001 02 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $11,368 $0 Not Implemented
WI0386 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,197 $12,760 Not Implemented
WI0386 # 04 Y:2001 04 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,301 $2,460 Not Implemented
WI0386 # 05 Y:2001 05 2001 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,200 $9,600 Not Implemented
WI0386 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,502 $1,000 Not Implemented
WI0386 # 07 Y:2001 07 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,586 $1,280 Not Implemented
WI0386 # 08 Y:2001 08 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $478 $90 Not Implemented
WI0386 # 09 Y:2001 09 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,641 $3,750 Not Implemented
WI0386 # 10 Y:2001 10 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,158 $627 Not Implemented
WI0386 # 11 Y:2001 11 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $533 $0 Not Implemented
WI0385 # 01 Y:2000 01 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $152,011 $27,200 Not Implemented