Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,119
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0387 # 08 Y:2001 | 08 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,292 | $0 | Not Implemented |
WI0387 # 02 Y:2001 | 02 | 2001 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $24,138 | $0 | Implemented |
WI0387 # 01 Y:2001 | 01 | 2001 | IMPROVE SPACE COMFORT CONDITIONING | $178,421 | $400,000 | n/a |
WI0387 # 06 Y:2001 | 06 | 2001 | INSTALL OCCUPANCY SENSORS | $418 | $300 | Implemented |
WI0387 # 10 Y:2001 | 10 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $387 | $90 | Implemented |
WI0387 # 04 Y:2001 | 04 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,726 | $1,994 | Implemented |
WI0387 # 03 Y:2001 | 03 | 2001 | INSTALL SPECTRAL REFLECTORS / DELAMP | $9,794 | $0 | Implemented |
WI0387 # 07 Y:2001 | 07 | 2001 | USE EVAPORATION TO CONCENTRATE MATERIAL | $8,770 | $16,000 | Implemented |
WI0387 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $712 | $2,050 | Not Implemented |
WI0387 # 09 Y:2001 | 09 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $630 | $640 | Implemented |
WI0386 # 11 Y:2001 | 11 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $533 | $0 | Not Implemented |
WI0386 # 04 Y:2001 | 04 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,301 | $2,460 | Not Implemented |
WI0386 # 06 Y:2001 | 06 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,502 | $1,000 | Not Implemented |
WI0386 # 05 Y:2001 | 05 | 2001 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,200 | $9,600 | Not Implemented |
WI0386 # 02 Y:2001 | 02 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $11,368 | $0 | Not Implemented |
WI0386 # 10 Y:2001 | 10 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,158 | $627 | Not Implemented |
WI0386 # 01 Y:2001 | 01 | 2001 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $27,904 | $20,000 | Not Implemented |
WI0386 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,197 | $12,760 | Not Implemented |
WI0386 # 07 Y:2001 | 07 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,586 | $1,280 | Not Implemented |
WI0386 # 08 Y:2001 | 08 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $478 | $90 | Not Implemented |
WI0386 # 09 Y:2001 | 09 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,641 | $3,750 | Not Implemented |
WI0384 # 09 Y:2000 | 09 | 2000 | USE OPTIMUM THICKNESS INSULATION | $370 | $375 | Not Implemented |
WI0384 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,119 | $6,500 | Not Implemented |
WI0384 # 04 Y:2000 | 04 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,935 | $3,250 | Not Implemented |
WI0384 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,107 | $20,000 | Not Implemented |