IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0360 # 10 Y:1999 10 1999 INSTALL OCCUPANCY SENSORS $2,640 $5,800 Implemented
WI0360 # 11 Y:1999 11 1999 REDUCE VENTILATION AIR $1,891 $500 Implemented
WI0360 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,603 $640 Not Implemented
WI0360 # 08 Y:1999 08 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,510 $400 Implemented
WI0360 # 09 Y:1999 09 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,092 $500 Implemented
WI0360 # 01 Y:1999 01 1999 USE A DIFFERENT OR RECYCLED RAW MATERIAL $24,990 $0 Not Implemented
WI0360 # 13 Y:1999 13 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,148 $725 Not Implemented
WI0360 # 03 Y:1999 03 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $15,954 $16,000 Not Implemented
WI0360 # 05 Y:1999 05 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,661 $8,000 Not Implemented
WI0360 # 12 Y:1999 12 1999 INSTALL TIMERS AND/OR THERMOSTATS $1,735 $400 Not Implemented
WI0360 # 06 Y:1999 06 1999 RECOVER WASTE HEAT FROM EQUIPMENT $6,483 $1,000 Not Implemented
WI0360 # 02 Y:1999 02 1999 DISTILL CONTAMINATED SOLVENTS FOR REUSE $17,374 $22,500 Not Implemented
WI0360 # 04 Y:1999 04 1999 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $7,161 $40,800 Not Implemented
WI0359 # 01 Y:1999 01 1999 DISTILL CONTAMINATED SOLVENTS FOR REUSE $6,185 $7,500 Not Implemented
WI0359 # 07 Y:1999 07 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,391 $500 Not Implemented
WI0359 # 06 Y:1999 06 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $1,781 $0 Implemented
WI0359 # 03 Y:1999 03 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,831 $0 Not Implemented
WI0359 # 08 Y:1999 08 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $872 $1,000 Not Implemented
WI0359 # 10 Y:1999 10 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $278 $0 Implemented
WI0359 # 02 Y:1999 02 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $5,455 $24,000 Not Implemented
WI0359 # 09 Y:1999 09 1999 REDUCE VENTILATION AIR $648 $500 Implemented
WI0359 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,815 $100 Implemented
WI0359 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,067 $1,000 Not Implemented
WI0358 # 02 Y:1999 02 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $92,705 $0 Not Implemented
WI0358 # 01 Y:1999 01 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $97,790 $44,000 Implemented