Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,740
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0645 # 05 Y:2023 | 05 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $751 | $3,668 | Not Implemented |
WV0645 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,119 | $24,727 | Not Implemented |
WV0645 # 06 Y:2023 | 06 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $540 | $1,161 | Implemented |
WV0645 # 08 Y:2023 | 08 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $367 | $219 | Implemented |
WV0645 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $1,083 | $5,364 | Not Implemented |
WV0645 # 09 Y:2023 | 09 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $182 | $646 | Implemented |
WV0645 # 02 Y:2023 | 02 | 2023 | INSTALL SET-BACK TIMERS | $1,981 | $1,274 | Implemented |
WV0645 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $835 | $218 | Implemented |
WV0645 # 07 Y:2023 | 07 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $517 | $1,081 | Implemented |
WV0640 # 07 Y:2023 | 07 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $3,201 | $1,563 | Implemented |
WV0640 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,002 | $9,194 | Implemented |
WV0640 # 12 Y:2023 | 12 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $66 | $178 | Implemented |
WV0640 # 01 Y:2023 | 01 | 2023 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $216,485 | $812,825 | Not Implemented |
WV0640 # 10 Y:2023 | 10 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,582 | $5,558 | Implemented |
WV0640 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,011 | $596 | Implemented |
WV0640 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,135 | $10,165 | Implemented |
WV0640 # 11 Y:2023 | 11 | 2023 | INSULATE BARE EQUIPMENT | $930 | $135 | Implemented |
WV0640 # 06 Y:2023 | 06 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,905 | $1,500 | Implemented |
WV0640 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $43,670 | $212,780 | Not Implemented |
WV0640 # 03 Y:2023 | 03 | 2023 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $43,563 | $209,750 | Not Implemented |
WV0640 # 09 Y:2023 | 09 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $2,907 | $11,135 | Not Implemented |
WV0639 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,872 | $1,250 | Implemented |
WV0639 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $17,944 | $36,920 | Not Implemented |
WV0639 # 11 Y:2023 | 11 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,250 | $908 | Implemented |
WV0639 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $76,363 | $381,250 | Not Implemented |