IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,769

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0683 # 02 Y:2025 02 2025 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,650 $1,300 n/a
WV0683 # 01 Y:2025 01 2025 INSTALL OCCUPANCY SENSORS $4,707 $2,420 n/a
WV0683 # 03 Y:2025 03 2025 UPGRADE CONTROLS ON COMPRESSORS $1,332 $985 n/a
WV0683 # 07 Y:2025 07 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $209 $60 n/a
WV0683 # 05 Y:2025 05 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $947 $500 n/a
WV0683 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $703 $188 n/a
WV0683 # 04 Y:2025 04 2025 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,279 $3,050 n/a
WV0681 # 05 Y:2025 05 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,725 $848 n/a
WV0681 # 04 Y:2025 04 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,385 $5,940 n/a
WV0681 # 03 Y:2025 03 2025 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,352 $3,890 n/a
WV0681 # 08 Y:2025 08 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $308 $675 n/a
WV0681 # 01 Y:2025 01 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,629 $34,630 n/a
WV0681 # 02 Y:2025 02 2025 DEVELOP A REPAIR/REPLACE POLICY $9,972 $8,140 n/a
WV0681 # 06 Y:2025 06 2025 INSULATE BARE EQUIPMENT $1,989 $4,797 n/a
WV0681 # 07 Y:2025 07 2025 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,642 $5,200 n/a
WV0671 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $3,901 $6,364 Implemented
WV0671 # 14 Y:2024 14 2024 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $314 $1,322 Not Implemented
WV0671 # 12 Y:2024 12 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $799 $1,648 Implemented
WV0671 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,594 $38,917 Not Implemented
WV0671 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $16,714 $10,679 Not Implemented
WV0671 # 09 Y:2024 09 2024 DEVELOP A REPAIR/REPLACE POLICY $3,020 $1,180 Implemented
WV0671 # 13 Y:2024 13 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $768 $176 Implemented
WV0671 # 11 Y:2024 11 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,525 $7,504 Not Implemented
WV0671 # 08 Y:2024 08 2024 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,623 $1,200 Implemented
WV0671 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,904 $15,193 Implemented