IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0419 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $774 $528 Implemented
WV0419 # 03 Y:2010 03 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $27,845 $59,247 Not Implemented
WV0419 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $66,262 $161,162 Implemented
WV0419 # 01 Y:2010 01 2010 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $80,000 $53,870 Not Implemented
WV0413 # 10 Y:2010 10 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,565 $7,770 Not Implemented
WV0413 # 13 Y:2010 13 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,528 $1,876 Not Implemented
WV0413 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,242 $16,759 Implemented
WV0413 # 16 Y:2010 16 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $288 $357 Implemented
WV0413 # 15 Y:2010 15 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,069 $1,000 Implemented
WV0413 # 14 Y:2010 14 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,830 $6,571 Implemented
WV0413 # 01 Y:2010 01 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $108,743 $89,900 Not Implemented
WV0413 # 02 Y:2010 02 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $89,967 $129,542 Not Implemented
WV0413 # 06 Y:2010 06 2010 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $24,889 $9,534 Implemented
WV0413 # 08 Y:2010 08 2010 RECOVER WASTE HEAT FROM EQUIPMENT $12,163 $1,048 Not Implemented
WV0413 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $77,291 $154,121 Implemented
WV0413 # 09 Y:2010 09 2010 DEVELOP A REPAIR/REPLACE POLICY $10,138 $1,674 Implemented
WV0413 # 11 Y:2010 11 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,414 $0 Implemented
WV0413 # 05 Y:2010 05 2010 COVER OPEN TANKS $41,697 $9,404 Not Implemented
WV0413 # 07 Y:2010 07 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $14,418 $0 Implemented
WV0413 # 04 Y:2010 04 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $59,435 $55,000 Implemented
WV0412 # 04 Y:2010 04 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,191 $9,460 Not Implemented
WV0412 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,536 $5,263 Implemented
WV0412 # 06 Y:2010 06 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,764 $1,000 Implemented
WV0412 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,926 $686 Not Implemented
WV0412 # 08 Y:2010 08 2010 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,795 $0 Implemented