Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,871
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0135 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,626 | $1,418 | Implemented |
IP0135 # 07 Y:2020 | 07 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $957 | $588 | Implemented |
IP0135 # 09 Y:2020 | 09 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,937 | $3,800 | Implemented |
IP0135 # 12 Y:2020 | 12 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,916 | $6,013 | Implemented |
IP0134 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,106 | $2,237 | Implemented |
IC0236 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,924 | $30,183 | Implemented |
IC0236 # 03 Y:2020 | 03 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $15,481 | $0 | Implemented |
IC0236 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,626 | $4,075 | Implemented |
IP0132 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,251 | $64 | Implemented |
IP0132 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $711 | $47 | Implemented |
UD1012 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,178 | $1,000 | Implemented |
UD1012 # 06 Y:2020 | 06 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $67,773 | $0 | Implemented |
UD1012 # 07 Y:2020 | 07 | 2020 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $49,540 | $21,295 | Implemented |
UD1012 # 09 Y:2020 | 09 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $27,338 | $0 | Implemented |
UD1012 # 14 Y:2020 | 14 | 2020 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,073 | $0 | Implemented |
UD1012 # 15 Y:2020 | 15 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,548 | $0 | Implemented |
UD1012 # 16 Y:2020 | 16 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,160 | $0 | Implemented |
UD1012 # 17 Y:2020 | 17 | 2020 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $24,810 | $35,000 | Implemented |
IP0131 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,581 | $300 | Implemented |
IP0131 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,356 | $1,500 | Implemented |
IP0131 # 07 Y:2020 | 07 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,109 | $1,524 | Implemented |
IP0131 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,771 | $31,062 | Implemented |
IP0131 # 10 Y:2020 | 10 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,654 | $60,600 | Implemented |
IC0231 # 01 Y:2020 | 01 | 2020 | OPTIMIZE PLANT POWER FACTOR | $15,040 | $26,145 | Implemented |
IC0231 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,285 | $6,673 | Implemented |