IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75,351

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS1024 # 01 Y:2024 01 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,372 $0 Implemented
LS1024 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $343 $0 Implemented
LS1024 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,551 $5,440 Implemented
LS0924 # 01 Y:2024 01 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,991 $0 Implemented
LS0924 # 02 Y:2024 02 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,667 $250 Implemented
LS0924 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,495 $10,257 Implemented
LS0924 # 06 Y:2024 06 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $27,561 $98,980 Implemented
MZ0367 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,987 $1,000 Implemented
MZ0367 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $852 $400 Implemented
MZ0367 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,969 $3,120 Implemented
UD1093 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,522 $2,450 Implemented
UD1093 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,442 $953 Implemented
LS2421 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $8,504 $12,500 Implemented
LS2421 # 03 Y:2024 03 2024 USE OTHER WASTE CONCENTRATION METHODS $590,512 $783,539 Implemented
UD1092 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $26,516 $0 Implemented
UD1092 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $60,291 $0 Implemented
TT0319 # 03 Y:2024 03 2024 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $9,169 $0 Implemented
TT0319 # 04 Y:2024 04 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,842 $0 Implemented
TT0319 # 05 Y:2024 05 2024 INSTALL TIMERS AND/OR THERMOSTATS $5,922 $7,350 Implemented
TT0319 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $4,645 $900 Implemented
TT0319 # 07 Y:2024 07 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,402 $3,250 Implemented
TT0319 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $497 $32 Implemented
WV0669 # 01 Y:2024 01 2024 REPAIR OR REPLACE STEAM TRAPS $19,270 $9,950 Implemented
WV0669 # 03 Y:2024 03 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $13,442 $5,225 Implemented
WV0669 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,886 $1,088 Implemented