IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72,865

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2311 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,096 $3,700 Implemented
LS2311 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,014 $39,200 Implemented
OK1093 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,678 $10,052 Implemented
OK1093 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $420 $900 Implemented
OK1093 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $29,830 $374,400 Implemented
OK1093 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,723 $1,260 Implemented
OK1093 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,087 $343 Implemented
OK1093 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,010 $0 Implemented
OK1093 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,345 $8,534 Implemented
OK1093 # 08 Y:2023 08 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,354 $1,420 Implemented
OK1093 # 11 Y:2023 11 2023 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $98,980 $367,077 Implemented
OK1093 # 12 Y:2023 12 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $150,722 $300,000 Implemented
OK1093 # 13 Y:2023 13 2023 MAKE A NEW BY-PRODUCT $1,221,405 $1,600,000 Implemented
UD1060 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $139 $0 Implemented
UD1060 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $300 $952 Implemented
UD1060 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,544 $17,274 Implemented
UU0221 # 01 Y:2023 01 2023 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $27,210 $12,350 Implemented
UU0221 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $6,221 $11,385 Implemented
UU0221 # 05 Y:2023 05 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,589 $4,500 Implemented
UU0226 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,910 $800 Implemented
UU0226 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,162 $2,000 Implemented
UU0226 # 03 Y:2023 03 2023 USE OPTIMUM TEMPERATURE $2,090 $2,000 Implemented
UF0597 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,876 $14,705 Implemented
UF0597 # 02 Y:2023 02 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,736 $15,722 Implemented
UF0597 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,612 $25,370 Implemented