IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,075

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0090 # 01 Y:2005 01 2005 AIR CONDITION ONLY SPACE NECESSARY $11,500 $225 Implemented
LE0225 # 02 Y:2005 02 2005 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $17,500 $50,000 Implemented
LE0225 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,707 $200 Implemented
LE0225 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,558 $100 Implemented
LE0225 # 07 Y:2005 07 2005 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,914 $2,500 Implemented
LE0225 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,090 $35,595 Implemented
IA0376 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $550 $50 Implemented
IA0376 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $41 $72 Implemented
IA0376 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,730 $2,211 Implemented
IA0376 # 05 Y:2005 05 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $382 $1,000 Implemented
LE0223 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,650 $50 Implemented
LE0223 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,831 $2,500 Implemented
LE0223 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,281 $100 Implemented
LE0223 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,391 $250 Implemented
LE0223 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $844 $80 Implemented
LE0223 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $457 $1,000 Implemented
LE0223 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $375 $300 Implemented
LE0223 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,460 $0 Implemented
TA0103 # 02 Y:2005 02 2005 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,365 $2,620 Implemented
TA0103 # 03 Y:2005 03 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $14,113 $0 Implemented
TA0103 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,990 $0 Implemented
TA0103 # 05 Y:2005 05 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $700 $1,070 Implemented
OR0492 # 01 Y:2005 01 2005 TREAT AND REUSE RINSE WATERS $96,200 $30,000 Implemented
OR0492 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,600 $1,800 Implemented
OR0492 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,130 $0 Implemented