IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,265

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0379 # 08 Y:2000 08 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $800 $0 Implemented
AM0378 # 01 Y:2000 01 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $21,982 $6,500 Implemented
AM0378 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $18,650 $39,500 Implemented
AM0378 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,660 $500 Implemented
AM0378 # 04 Y:2000 04 2000 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $13,630 $699 Implemented
AM0378 # 05 Y:2000 05 2000 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $11,000 $1,350 Implemented
AM0378 # 07 Y:2000 07 2000 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $4,000 $0 Implemented
AM0378 # 08 Y:2000 08 2000 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM $3,610 $0 Implemented
AM0378 # 09 Y:2000 09 2000 PAY BILLS ON TIME TO AVOID LATE FEES $2,450 $0 Implemented
AM0378 # 11 Y:2000 11 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $2,310 $2,800 Implemented
OK0601 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $684 $3,500 Implemented
OK0601 # 03 Y:2000 03 2000 USE PHOTOCELL CONTROLS $17,881 $5,000 Implemented
OK0601 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $14,040 $35,000 Implemented
AM0377 # 01 Y:2000 01 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $27,190 $0 Implemented
AM0377 # 02 Y:2000 02 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $11,500 $6,100 Implemented
AM0377 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,870 $500 Implemented
AM0377 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $450 $110 Implemented
AM0377 # 06 Y:2000 06 2000 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $320 $0 Implemented
AM0377 # 07 Y:2000 07 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $230 $0 Implemented
AM0376 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,410 $3,340 Implemented
AM0376 # 05 Y:2000 05 2000 ADD AREA LIGHTING SWITCHES $950 $640 Implemented
AM0376 # 06 Y:2000 06 2000 USE PHOTOCELL CONTROLS $730 $605 Implemented
AM0376 # 07 Y:2000 07 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $700 $350 Implemented
AM0376 # 08 Y:2000 08 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $600 $1,030 Implemented
TP0019 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $368 $2,161 Implemented