IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,628

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0113 # 03 Y:1997 03 1997 USE SYNTHETIC LUBRICANT $1,450 $360 Implemented
WV0113 # 07 Y:1997 07 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,000 $500 Implemented
WV0113 # 09 Y:1997 09 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,382 $1,800 Implemented
WV0113 # 10 Y:1997 10 1997 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $735 $50 Implemented
WV0113 # 11 Y:1997 11 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,550 $200 Implemented
WV0113 # 12 Y:1997 12 1997 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,200 $100 Implemented
UD0513 # 04 Y:1997 04 1997 OPTIMIZE PLANT POWER FACTOR $21,006 $25,000 Implemented
UD0513 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,283 $6,465 Implemented
UD0513 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,603 $19,910 Implemented
UD0513 # 07 Y:1997 07 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,228 $16,000 Implemented
WV0109 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,527 $5,295 Implemented
WV0109 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,337 $384 Implemented
WV0109 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,265 $3,000 Implemented
WV0109 # 06 Y:1997 06 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $7,904 $6,300 Implemented
WV0109 # 07 Y:1997 07 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,550 $441 Implemented
UD0511 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,757 $21,000 Implemented
UD0511 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $885 $4,700 Implemented
UD0511 # 03 Y:1997 03 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $28,000 $12,000 Implemented
UD0511 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,452 $20,000 Implemented
UD0511 # 05 Y:1997 05 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $52,379 $35,000 Implemented
UD0511 # 06 Y:1997 06 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $56,779 $70,000 Implemented
UD0511 # 08 Y:1997 08 1997 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,802 $0 Implemented
UD0510 # 02 Y:1997 02 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,651 $500 Implemented
UD0510 # 03 Y:1997 03 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,314 $1,000 Implemented
UD0509 # 02 Y:1996 02 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,840 $0 Implemented