IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74,804

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0663 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $220 $181 Implemented
WV0663 # 06 Y:2024 06 2024 UPGRADE CONTROLS ON COMPRESSORS $127 $635 Implemented
IP0194 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,623 $0 Implemented
IP0194 # 02 Y:2024 02 2024 USE OPTIMUM TEMPERATURE $2,876 $0 Implemented
IP0194 # 03 Y:2024 03 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,317 $0 Implemented
IP0194 # 04 Y:2024 04 2024 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,154 $0 Implemented
IP0194 # 08 Y:2024 08 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,174 $16,475 Implemented
MU0045 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,606 $17 Implemented
MU0045 # 06 Y:2024 06 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $5,088 $0 Implemented
MU0045 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,694 $706 Implemented
MU0045 # 08 Y:2024 08 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,871 $0 Implemented
MU0045 # 14 Y:2024 14 2024 PAY BILLS ON TIME TO AVOID LATE FEES $4,768 $0 Implemented
MI0442 # 01 Y:2024 01 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $16,134 $240 Implemented
MI0442 # 02 Y:2024 02 2024 METER WASTE WATER $13,483 $956 Implemented
MI0442 # 06 Y:2024 06 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,002 $70 Implemented
LE0569 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,637 $0 Implemented
LE0569 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,781 $400 Implemented
LE0569 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $92 $70 Implemented
LE0569 # 05 Y:2024 05 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,415 $1,500 Implemented
LE0569 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $912 $1,400 Implemented
LS0624 # 01 Y:2024 01 2024 INSTALL TIMERS AND/OR THERMOSTATS $7,878 $200 Implemented
LS0624 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,440 $1,764 Implemented
LS0624 # 03 Y:2024 03 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,783 $89,810 Implemented
LS0624 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $47,604 $514,800 Implemented
OK1114 # 02 Y:2024 02 2024 REDUCE VENTILATION AIR $3,939 $0 Implemented