IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,628

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0237 # 06 Y:1987 06 1987 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,305 $67 Implemented
UD0237 # 07 Y:1987 07 1987 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,948 $4,140 Implemented
UD0237 # 08 Y:1987 08 1987 MINIMIZE WATER USAGE $3,986 $2,000 Implemented
UD0237 # 09 Y:1987 09 1987 RECOVER AND REUSE COOLING WATER $2,400 $4,000 Implemented
UD0238 # 01 Y:1987 01 1987 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $20,472 $36,000 Implemented
UD0238 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,814 $0 Implemented
UD0238 # 03 Y:1987 03 1987 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,600 $250 Implemented
UD0238 # 04 Y:1987 04 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,229 $40 Implemented
UD0239 # 01 Y:1987 01 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,627 $2,500 Implemented
UD0239 # 02 Y:1987 02 1987 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $23,356 $10,000 Implemented
UD0239 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,341 $600 Implemented
UD0239 # 04 Y:1987 04 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,069 $6,000 Implemented
UD0241 # 01 Y:1988 01 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,400 $600 Implemented
UD0241 # 06 Y:1988 06 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,574 $1,000 Implemented
UD0234 # 01 Y:1987 01 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,497 $15,000 Implemented
UD0234 # 02 Y:1987 02 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,021 $0 Implemented
UD0234 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $200 $60 Implemented
UD0235 # 01 Y:1987 01 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,496 $500 Implemented
UD0235 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,497 $0 Implemented
UD0236 # 02 Y:1987 02 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,157 $0 Implemented
UD0230 # 01 Y:1987 01 1987 RECOVER WASTE HEAT FROM EQUIPMENT $1,303 $1,200 Implemented
UD0230 # 02 Y:1987 02 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,952 $50,000 Implemented
UD0230 # 03 Y:1987 03 1987 INSTALL SET-BACK TIMERS $607 $12,500 Implemented
UD0231 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,469 $1,070 Implemented
UD0231 # 03 Y:1987 03 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,586 $0 Implemented