IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75,206

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0555 # 01 Y:2024 01 2024 PAY BILLS ON TIME TO AVOID LATE FEES $923 $0 Implemented
SU0555 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,994 $104 Implemented
UC2410 # 02 Y:2024 02 2024 PAY UTILITY BILLS ON TIME $187 $0 Implemented
UC2410 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,168 $100 Implemented
UC2410 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,615 $75 Implemented
UC2410 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,308 $1,300 Implemented
UC2410 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,791 $3,455 Implemented
UC2410 # 08 Y:2024 08 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $185 $0 Implemented
UU0256 # 01 Y:2024 01 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $43,875 $401,481 Implemented
UU0256 # 04 Y:2024 04 2024 REDUCE EXCESSIVE BOILER BLOWDOWN $5,024 $7,960 Implemented
UF0619 # 01 Y:2024 01 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,482 $6,000 Implemented
UF0619 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,655 $13,445 Implemented
UF0619 # 05 Y:2024 05 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,458 $9,470 Implemented
UF0619 # 06 Y:2024 06 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,257 $5,940 Implemented
UF0619 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,007 $0 Implemented
UF0619 # 08 Y:2024 08 2024 UPGRADE CONTROLS ON COMPRESSORS $705 $1,252 Implemented
UF0619 # 09 Y:2024 09 2024 AUTOMATE FINISHING PROCESS $315,000 $181,056 Implemented
UF0619 # 10 Y:2024 10 2024 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $300,000 $183,056 Implemented
LE0579 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $1,555 $510 Implemented
LE0579 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,704 $2,300 Implemented
LE0579 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,804 $49,222 Implemented
SU0554 # 02 Y:2024 02 2024 PAY BILLS ON TIME TO AVOID LATE FEES $1,907 $0 Implemented
SU0554 # 05 Y:2024 05 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,553 $84 Implemented
SU0554 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,419 $54 Implemented
SU0554 # 08 Y:2024 08 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $82,048 $526,750 Implemented