Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
695
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0334 # 01 Y:1995 | 01 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,139 | $0 | Implemented |
HO0096 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,442 | $6,685 | Implemented |
HO0096 # 05 Y:1995 | 05 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,471 | $1,000 | Implemented |
MA0330 # 05 Y:1995 | 05 | 1995 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $753 | $1,930 | Implemented |
MA0326 # 03 Y:1995 | 03 | 1995 | INSULATE BARE EQUIPMENT | $4,443 | $7,770 | Implemented |
MA0326 # 04 Y:1995 | 04 | 1995 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,604 | $4,305 | Implemented |
MA0326 # 05 Y:1995 | 05 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,293 | $2,500 | Implemented |
MA0326 # 08 Y:1995 | 08 | 1995 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $653 | $836 | Implemented |
MA0325 # 01 Y:1995 | 01 | 1995 | COVER OPEN TANKS | $3,618 | $1,883 | Implemented |
MA0325 # 04 Y:1995 | 04 | 1995 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,557 | $1,000 | Implemented |
MA0325 # 05 Y:1995 | 05 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $922 | $0 | Implemented |
MA0325 # 06 Y:1995 | 06 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $453 | $1,190 | Implemented |
MA0325 # 07 Y:1995 | 07 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $382 | $0 | Implemented |
MA0325 # 08 Y:1995 | 08 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $378 | $255 | Implemented |
MA0325 # 09 Y:1995 | 09 | 1995 | RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE | $28,487 | $53,330 | Implemented |
MA0325 # 10 Y:1995 | 10 | 1995 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $7,953 | $5,526 | Implemented |
MA0324 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,424 | $14,935 | Implemented |
MA0324 # 05 Y:1995 | 05 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,835 | $1,500 | Implemented |
MA0310 # 01 Y:1994 | 01 | 1994 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $30,270 | $59,522 | Implemented |
MA0310 # 03 Y:1994 | 03 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,605 | $0 | Implemented |
MA0310 # 04 Y:1994 | 04 | 1994 | USE RADIANT HEATER FOR SPOT HEATING | $5,208 | $6,560 | Implemented |
MA0310 # 07 Y:1994 | 07 | 1994 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,505 | $2,697 | Implemented |
MA0310 # 08 Y:1994 | 08 | 1994 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,800 | $0 | Implemented |
MA0308 # 01 Y:1994 | 01 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $87,650 | $18,145 | Implemented |
MA0308 # 02 Y:1994 | 02 | 1994 | REPAIR OR REPLACE STEAM TRAPS | $19,471 | $813 | Implemented |