Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,719
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0517 # 08 Y:2007 | 08 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $930 | $0 | Implemented |
OR0516 # 02 Y:2007 | 02 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,100 | $37,100 | Implemented |
OR0516 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,600 | $15,300 | Implemented |
OR0516 # 04 Y:2007 | 04 | 2007 | INSTALL OCCUPANCY SENSORS | $5,300 | $7,800 | Implemented |
OR0516 # 05 Y:2007 | 05 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,400 | $9,800 | Implemented |
OR0515 # 01 Y:2007 | 01 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,800 | $0 | Implemented |
OR0515 # 02 Y:2007 | 02 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,200 | $0 | Implemented |
OR0515 # 03 Y:2007 | 03 | 2007 | INSTALL OCCUPANCY SENSORS | $14,600 | $45,000 | Implemented |
OR0514 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,300 | $0 | Implemented |
OR0514 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $500 | $7,700 | Implemented |
OR0514 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,700 | $0 | Implemented |
OR0505 # 01 Y:2006 | 01 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $18,900 | $0 | Implemented |
OR0505 # 02 Y:2006 | 02 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,600 | $0 | Implemented |
OR0505 # 08 Y:2006 | 08 | 2006 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $168,270 | $185,000 | Implemented |
OR0507 # 01 Y:2006 | 01 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,600 | $0 | Implemented |
OR0507 # 02 Y:2006 | 02 | 2006 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $46,800 | $2,000 | Implemented |
OR0507 # 04 Y:2006 | 04 | 2006 | KEEP BOILER TUBES CLEAN | $13,700 | $4,000 | Implemented |
OR0507 # 05 Y:2006 | 05 | 2006 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $40,000 | $1,500 | Implemented |
OR0507 # 06 Y:2006 | 06 | 2006 | ADD ADDITIONAL PRODUCTION SHIFT | $60,100 | $41,100 | Implemented |
OR0507 # 10 Y:2006 | 10 | 2006 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $22,760 | $24,900 | Implemented |
OR0507 # 15 Y:2006 | 15 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,890 | $19,200 | Implemented |
OR0504 # 01 Y:2006 | 01 | 2006 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $64,300 | $20,000 | Implemented |
OR0504 # 02 Y:2006 | 02 | 2006 | REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS | $22,500 | $44,500 | Implemented |
OR0504 # 05 Y:2006 | 05 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $23,000 | $0 | Implemented |
OR0506 # 01 Y:2006 | 01 | 2006 | ADD ADDITIONAL PRODUCTION SHIFT | $360,000 | $2,100 | Implemented |