IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,628

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0094 # 02 Y:1983 02 1983 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,138 $11,160 Implemented
UD0089 # 02 Y:1983 02 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,879 $30,000 Implemented
UD0088 # 01 Y:1983 01 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,182 $0 Implemented
UD0088 # 02 Y:1983 02 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,951 $9,396 Implemented
UD0086 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,108 $480 Implemented
UD0086 # 02 Y:1983 02 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,175 $3,300 Implemented
UD0086 # 03 Y:1983 03 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $204 $0 Implemented
UD0086 # 04 Y:1983 04 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $139 $30 Implemented
UD0081 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $424 $341 Implemented
UD0081 # 02 Y:1983 02 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,911 $0 Implemented
UD0081 # 03 Y:1983 03 1983 INSULATE BARE EQUIPMENT $3,417 $188 Implemented
UD0071 # 03 Y:1983 03 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,364 $3,680 Implemented
UD0072 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,588 $581 Implemented
UD0072 # 03 Y:1983 03 1983 RECOVER WASTE HEAT FROM EQUIPMENT $6,416 $518 Implemented
UD0072 # 05 Y:1983 05 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $174 $0 Implemented
UD0072 # 07 Y:1983 07 1983 UPGRADE OBSOLETE EQUIPMENT $17,289 $0 Implemented
UD0074 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,071 $698 Implemented
UD0077 # 02 Y:1983 02 1983 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,987 $2,000 Implemented
UD0077 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,967 $500 Implemented
UD0065 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $662 $200 Implemented
UD0066 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,419 $2,525 Implemented
UD0066 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $147 $0 Implemented
UD0066 # 03 Y:1982 03 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $769 $0 Implemented
UD0070 # 02 Y:1982 02 1982 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,051 $10,000 Implemented
UD0070 # 03 Y:1982 03 1982 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $13,079 $15,000 Implemented