IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,532

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0645 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $835 $218 Implemented
WV0645 # 09 Y:2023 09 2023 DEVELOP A REPAIR/REPLACE POLICY $182 $646 Implemented
WV0645 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $517 $1,081 Implemented
LE0548 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,252 $2,480 Implemented
LE0548 # 07 Y:2023 07 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,121 $45,050 Implemented
LE0548 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,456 $100 Implemented
LE0548 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $5,982 $1,900 Implemented
LE0547 # 01 Y:2023 01 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $846 $400 Implemented
LE0547 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,448 $13,930 Implemented
LE0547 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $602 $1,720 Implemented
DL0221 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,723 $0 Implemented
DL0221 # 14 Y:2023 14 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,645 $500 Implemented
DL0221 # 07 Y:2023 07 2023 INSTALL TIMERS AND/OR THERMOSTATS $4,684 $500 Implemented
DL0221 # 04 Y:2023 04 2023 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $781 $0 Implemented
DL0221 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $30,683 $0 Implemented
DL0221 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $293 $0 Implemented
DL0221 # 09 Y:2023 09 2023 AIR CONDITION ONLY SPACE NECESSARY $2,678 $610 Implemented
DL0221 # 16 Y:2023 16 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $39,688 $4,615 Implemented
DL0221 # 13 Y:2023 13 2023 REPAIR AND ELIMINATE STEAM LEAKS $53,076 $20,000 Implemented
DL0221 # 12 Y:2023 12 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $6,218 $1,080 Implemented
DL0221 # 11 Y:2023 11 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $812 $2,301 Implemented
WV0640 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,011 $596 Implemented
WV0640 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,002 $9,194 Implemented
WV0640 # 11 Y:2023 11 2023 INSULATE BARE EQUIPMENT $930 $135 Implemented
WV0640 # 07 Y:2023 07 2023 DEVELOP A REPAIR/REPLACE POLICY $3,201 $1,563 Implemented