IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,578

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0105 # 01 Y:1990 01 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,875 $1,250 Implemented
WI0105 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,146 $432 Implemented
WI0105 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $1,696 $1,400 Implemented
WI0105 # 06 Y:1990 06 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,016 $600 Implemented
WI0105 # 08 Y:1990 08 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,002 $500 Implemented
WI0105 # 11 Y:1990 11 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $213 $0 Implemented
UD0329 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $17,856 $20,000 Implemented
UD0329 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $5,309 $1,000 Implemented
UD0329 # 03 Y:1990 03 1990 BURN WASTE OIL FOR HEAT $6,067 $0 Implemented
UD0329 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,783 $7,500 Implemented
UD0329 # 05 Y:1990 05 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,223 $6,240 Implemented
UD0330 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $8,017 $15,000 Implemented
KU0330 # 03 Y:1990 03 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,198 $0 Implemented
KU0330 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $724 $1,400 Implemented
MA0199 # 02 Y:1990 02 1990 INSULATE FEEDWATER TANK $1,053 $352 Implemented
MA0199 # 04 Y:1990 04 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $19,829 $22,178 Implemented
MA0199 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,137 $3,492 Implemented
MA0200 # 01 Y:1990 01 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $45,965 $47,912 Implemented
MA0200 # 02 Y:1990 02 1990 REPAIR OR REPLACE STEAM TRAPS $4,450 $2,880 Implemented
MA0200 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,023 $15,974 Implemented
MA0200 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $106 $73 Implemented
AM0105 # 02 Y:1990 02 1990 OPTIMIZE PLANT POWER FACTOR $7,790 $21,500 Implemented
AM0105 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,600 $500 Implemented
AM0105 # 04 Y:1990 04 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,000 $0 Implemented
AM0105 # 06 Y:1990 06 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,800 $400 Implemented