IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,578

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0393 # 02 Y:1990 02 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,221 $12,000 Implemented
TN0393 # 04 Y:1990 04 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $1,609 $1,741 Implemented
TN0393 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,739 $0 Implemented
TN0393 # 06 Y:1990 06 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $496 $800 Implemented
TN0393 # 07 Y:1990 07 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,781 $25,000 Implemented
TN0393 # 08 Y:1990 08 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $416 $820 Implemented
OR0081 # 01 Y:1990 01 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,762 $68,000 Implemented
OR0081 # 02 Y:1990 02 1990 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,741 $635 Implemented
OR0081 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,720 $10,000 Implemented
OR0081 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $137 $324 Implemented
RU0080 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,218 $68 Implemented
RU0080 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $602 $86 Implemented
RU0080 # 06 Y:1990 06 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,454 $6,245 Implemented
RU0081 # 01 Y:1990 01 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,465 $350 Implemented
RU0081 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,110 $0 Implemented
RU0081 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,558 $11,400 Implemented
RU0079 # 03 Y:1990 03 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,329 $0 Implemented
TN0390 # 01 Y:1990 01 1990 IMPROVE LUBRICATION PRACTICES $44,021 $13,500 Implemented
TN0390 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $39,625 $5,440 Implemented
TN0390 # 03 Y:1990 03 1990 INSTALL TIMERS AND/OR THERMOSTATS $11,893 $1,200 Implemented
TN0390 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $28,121 $12,250 Implemented
TN0390 # 05 Y:1990 05 1990 KEEP LAMPS AND REFLECTORS CLEAN $1,983 $5,850 Implemented
TN0390 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $703 $438 Implemented
TN0390 # 07 Y:1990 07 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $167,999 $976,000 Implemented
TN0391 # 01 Y:1990 01 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,900 $480 Implemented