IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,271

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0371 # 03 Y:2008 03 2008 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $179,387 $235,000 Implemented
WV0371 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $42,970 $2,500 Implemented
WV0371 # 05 Y:2008 05 2008 DEVELOP A REPAIR/REPLACE POLICY $29,665 $1,823 Implemented
WV0371 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,829 $2,310 Implemented
WV0371 # 08 Y:2008 08 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $14,852 $2,980 Implemented
WV0371 # 09 Y:2008 09 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,433 $3,500 Implemented
WV0371 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,725 $683 Implemented
WV0371 # 11 Y:2008 11 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,269 $530 Implemented
WV0370 # 01 Y:2008 01 2008 REPAIR OR REPLACE STEAM TRAPS $544,142 $5,500 Implemented
WV0370 # 02 Y:2008 02 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $416,253 $371,400 Implemented
WV0370 # 04 Y:2008 04 2008 DEVELOP A REPAIR/REPLACE POLICY $32,574 $3,560 Implemented
WV0370 # 05 Y:2008 05 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $21,799 $8,800 Implemented
WV0368 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $11,312 $2,971 Implemented
WV0368 # 02 Y:2008 02 2008 ELIMINATE/REDUCE AN OPERATION $1,977 $1,750 Implemented
WV0368 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $747 $1,927 Implemented
WV0368 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $181 $60 Implemented
WV0367 # 02 Y:2008 02 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $16,386 $3,500 Implemented
WV0367 # 03 Y:2008 03 2008 DEVELOP A REPAIR/REPLACE POLICY $11,577 $1,336 Implemented
WV0367 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,511 $0 Implemented
WV0367 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,538 $0 Implemented
WV0367 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $780 $2,158 Implemented
WV0365 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $75,759 $228,975 Implemented
WV0365 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,685 $75,450 Implemented
WV0365 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,614 $8,565 Implemented
WV0365 # 08 Y:2007 08 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,649 $9,450 Implemented