IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

757

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0265 # 03 Y:1988 03 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,892 $5,000 Implemented
KU0265 # 04 Y:1988 04 1988 INSTALL TURBULATORS $2,263 $1,250 Implemented
KU0265 # 05 Y:1988 05 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $771 $0 Implemented
KU0265 # 06 Y:1988 06 1988 RECOVER WASTE HEAT FROM EQUIPMENT $606 $700 Implemented
KU0265 # 08 Y:1988 08 1988 IMPROVE LUBRICATION PRACTICES $4,120 $0 Implemented
KU0265 # 09 Y:1988 09 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,325 $0 Implemented
KU0265 # 10 Y:1988 10 1988 MINIMIZE WATER USAGE $9,368 $6,400 Implemented
KU0265 # 11 Y:1988 11 1988 RECOVER AND REUSE COOLING WATER $7,327 $6,400 Implemented
KU0266 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $487 $282 Implemented
KU0266 # 02 Y:1988 02 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,274 $1,008 Implemented
KU0266 # 04 Y:1988 04 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,624 $100 Implemented
KU0266 # 05 Y:1988 05 1988 RECOVER AND REUSE COOLING WATER $791 $860 Implemented
KU0266 # 07 Y:1988 07 1988 RECOVER WASTE HEAT FROM EQUIPMENT $898 $1,500 Implemented
KU0266 # 09 Y:1988 09 1988 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $396 $580 Implemented
KU0264 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,741 $2,720 Implemented
KU0264 # 02 Y:1988 02 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $825 $40 Implemented
KU0264 # 03 Y:1988 03 1988 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $566 $1,200 Implemented
KU0264 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $168 $0 Implemented
CO0115 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,100 $7,000 Implemented
CO0115 # 03 Y:1988 03 1988 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $23,377 $5,000 Implemented
CO0115 # 04 Y:1988 04 1988 REDUCE EXCESS STEAM BLEEDING $3,914 $2,000 Implemented
CO0115 # 05 Y:1988 05 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $4,410 $10,670 Implemented
CO0115 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,111 $0 Implemented
CO0115 # 07 Y:1988 07 1988 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,557 $38,200 Implemented
CO0116 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $151,329 $7,000 Implemented