Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
73,772
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0153 # 13 Y:1985 | 13 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $586 | $175 | Implemented |
KU0153 # 14 Y:1985 | 14 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $294 | $43 | Implemented |
KU0153 # 15 Y:1985 | 15 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $105 | $50 | Implemented |
KU0153 # 17 Y:1985 | 17 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $234 | $43 | Implemented |
KU0154 # 02 Y:1985 | 02 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,380 | $3,000 | Implemented |
KU0154 # 03 Y:1985 | 03 | 1985 | INSTALL SET-BACK TIMERS | $4,194 | $1,052 | Implemented |
KU0154 # 04 Y:1985 | 04 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,813 | $500 | Implemented |
KU0154 # 07 Y:1985 | 07 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $974 | $0 | Implemented |
KU0154 # 08 Y:1985 | 08 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $2,887 | $1,200 | Implemented |
KU0154 # 11 Y:1985 | 11 | 1985 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $279 | $0 | Implemented |
KU0154 # 12 Y:1985 | 12 | 1985 | REPAIR AND ELIMINATE STEAM LEAKS | $108 | $50 | Implemented |
KU0155 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,743 | $948 | Implemented |
KU0155 # 02 Y:1985 | 02 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,311 | $278 | Implemented |
KU0155 # 03 Y:1985 | 03 | 1985 | IMPROVE LUBRICATION PRACTICES | $2,931 | $0 | Implemented |
KU0155 # 06 Y:1985 | 06 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $851 | $300 | Implemented |
KU0155 # 09 Y:1985 | 09 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,418 | $0 | Implemented |
KU0155 # 11 Y:1985 | 11 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $827 | $300 | Implemented |
KU0155 # 12 Y:1985 | 12 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $23 | $0 | Implemented |
KU0155 # 15 Y:1985 | 15 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $393 | $0 | Implemented |
KU0155 # 16 Y:1985 | 16 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $150 | $0 | Implemented |
KU0156 # 02 Y:1985 | 02 | 1985 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $9,544 | $3,342 | Implemented |
KU0156 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,064 | $2,200 | Implemented |
KU0156 # 06 Y:1985 | 06 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $5,611 | $1,200 | Implemented |
KU0156 # 07 Y:1985 | 07 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $6,298 | $1,200 | Implemented |
TN0242 # 01 Y:1985 | 01 | 1985 | REPAIR AND ELIMINATE STEAM LEAKS | $5,384 | $12 | Implemented |