IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,486

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0561 # 04 Y:2018 04 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $670 $683 Implemented
SD0561 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $615 $1,015 Implemented
SF0515 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,072 $2,241 Implemented
SD0560 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,240 $11,880 Implemented
SD0560 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,961 $19,600 Implemented
SD0560 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,948 $1,200 Implemented
SF0514 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,086 $0 Implemented
SF0514 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,916 $35,168 Implemented
SF0513 # 02 Y:2018 02 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $177,909 $41,250 Implemented
SF0513 # 03 Y:2018 03 2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $66,148 $67,793 Implemented
SF0513 # 05 Y:2018 05 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $64,975 $191,474 Implemented
SF0512 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,199 $0 Implemented
SF0512 # 02 Y:2018 02 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,566 $698 Implemented
SF0512 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,202 $9,352 Implemented
SF0512 # 04 Y:2018 04 2018 INSULATE BARE EQUIPMENT $118 $389 Implemented
SF0512 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $6,777 $31,273 Implemented
SD0557 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,478 $600 Implemented
SD0557 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $1,570 $1,860 Implemented
SD0557 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,245 $900 Implemented
SD0557 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,225 $3,775 Implemented
SF0511 # 01 Y:2017 01 2017 REPAIR AND ELIMINATE STEAM LEAKS $2,043 $0 Implemented
SF0511 # 02 Y:2017 02 2017 REDUCE VENTILATION AIR $1,680 $0 Implemented
SF0511 # 03 Y:2017 03 2017 COVER OPEN TANKS $2,660 $1,059 Implemented
SF0511 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $824 $1,526 Implemented
SF0511 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,786 $5,219 Implemented