Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72,784

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0019 # 01 Y:1982 01 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $550 $150 Implemented
UD0019 # 02 Y:1982 02 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,596 $5,400 Implemented
UD0020 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $20,824 $30,000 Implemented
UD0020 # 02 Y:1982 02 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $430 $300 Implemented
UD0021 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,609 $576 Implemented
UD0021 # 02 Y:1982 02 1982 INSTALL STORM WINDOWS AND DOORS $330 $314 Implemented
UD0022 # 01 Y:1982 01 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,141 $45 Implemented
UD0022 # 03 Y:1982 03 1982 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $39,185 $33,000 Implemented
UD0023 # 01 Y:1982 01 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,104 $6,705 Implemented
UD0023 # 02 Y:1982 02 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $14,006 $3,864 Implemented
UD0023 # 03 Y:1982 03 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,266 $300 Implemented
KU0033 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,443 $3,935 Implemented
KU0033 # 02 Y:1982 02 1982 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,573 $0 Implemented
KU0033 # 03 Y:1982 03 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $509 $700 Implemented
KU0033 # 04 Y:1982 04 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $69 $0 Implemented
OK0018 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,010 $9,000 Implemented
OK0018 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $594 $850 Implemented
OK0018 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $475 $241 Implemented
OK0018 # 04 Y:1982 04 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $86 $32 Implemented
OK0018 # 05 Y:1982 05 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $358 $158 Implemented
OK0019 # 03 Y:1982 03 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $539 $570 Implemented
OK0020 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $767 $30 Implemented
OK0020 # 02 Y:1982 02 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $101 $65 Implemented
OK0020 # 03 Y:1982 03 1982 INSTALL TIMERS AND/OR THERMOSTATS $567 $790 Implemented
OK0020 # 04 Y:1982 04 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $179 $644 Implemented