Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
73,539
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0083 # 02 Y:1983 | 02 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $26,153 | $3,160 | Implemented |
OK0083 # 03 Y:1983 | 03 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $3,118 | $1,600 | Implemented |
OK0083 # 04 Y:1983 | 04 | 1983 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,097 | $200 | Implemented |
OK0083 # 05 Y:1983 | 05 | 1983 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $323 | $730 | Implemented |
OK0083 # 06 Y:1983 | 06 | 1983 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $454 | $130 | Implemented |
OK0083 # 07 Y:1983 | 07 | 1983 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $16,433 | $34,221 | Implemented |
OK0083 # 08 Y:1983 | 08 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $469 | $127 | Implemented |
KU0070 # 05 Y:1983 | 05 | 1983 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,975 | $13,000 | Implemented |
KU0070 # 07 Y:1983 | 07 | 1983 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $664 | $42 | Implemented |
KU0071 # 03 Y:1983 | 03 | 1983 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,367 | $580 | Implemented |
KU0071 # 05 Y:1983 | 05 | 1983 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,450 | $30 | Implemented |
KU0071 # 07 Y:1983 | 07 | 1983 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $798 | $250 | Implemented |
KU0071 # 10 Y:1983 | 10 | 1983 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $124 | $87 | Implemented |
KU0073 # 02 Y:1983 | 02 | 1983 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,086 | $3,279 | Implemented |
KU0073 # 05 Y:1983 | 05 | 1983 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $3,151 | $1,000 | Implemented |
KU0073 # 06 Y:1983 | 06 | 1983 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,265 | $0 | Implemented |
KU0073 # 07 Y:1983 | 07 | 1983 | OPTIMIZE PLANT POWER FACTOR | $2,135 | $2,485 | Implemented |
KU0073 # 08 Y:1983 | 08 | 1983 | INSTALL AUTOMATIC STACK DAMPER | $1,787 | $1,544 | Implemented |
KU0073 # 09 Y:1983 | 09 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,117 | $1,100 | Implemented |
KU0073 # 10 Y:1983 | 10 | 1983 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $516 | $67 | Implemented |
KU0074 # 01 Y:1983 | 01 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $24,439 | $1,400 | Implemented |
KU0074 # 02 Y:1983 | 02 | 1983 | REDUCE FLUID FLOW RATES | $26,145 | $2,920 | Implemented |
KU0074 # 03 Y:1983 | 03 | 1983 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $14,284 | $5,200 | Implemented |
KU0074 # 04 Y:1983 | 04 | 1983 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,370 | $1,756 | Implemented |
KU0074 # 05 Y:1983 | 05 | 1983 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,448 | $358 | Implemented |