Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
73,765
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0105 # 04 Y:1983 | 04 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,661 | $167 | Implemented |
UD0106 # 01 Y:1983 | 01 | 1983 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,583 | $4,300 | Implemented |
UD0106 # 03 Y:1983 | 03 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,363 | $2,153 | Implemented |
TN0170 # 01 Y:1983 | 01 | 1983 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,220 | $15 | Implemented |
TN0170 # 02 Y:1983 | 02 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $18,840 | $500 | Implemented |
TN0170 # 03 Y:1983 | 03 | 1983 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,800 | $7,000 | Implemented |
TN0170 # 04 Y:1983 | 04 | 1983 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $13,230 | $4,000 | Implemented |
TN0180 # 01 Y:1983 | 01 | 1983 | INSTALL / REPAIR INSULATION ON STEAM LINES | $21,000 | $600 | Implemented |
TN0180 # 02 Y:1983 | 02 | 1983 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $450 | $100 | Implemented |
TN0180 # 03 Y:1983 | 03 | 1983 | REDUCE VENTILATION AIR | $3,500 | $200 | Implemented |
TN0177 # 02 Y:1983 | 02 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,540 | $400 | Implemented |
TN0177 # 03 Y:1983 | 03 | 1983 | USE MINIMUM STEAM OPERATING PRESSURE | $2,625 | $400 | Implemented |
TN0179 # 01 Y:1983 | 01 | 1983 | OPTIMIZE PLANT POWER FACTOR | $8,400 | $5,000 | Implemented |
TN0179 # 02 Y:1983 | 02 | 1983 | INSULATE BARE EQUIPMENT | $2,291 | $5,700 | Implemented |
TN0179 # 03 Y:1983 | 03 | 1983 | USE SOLAR HEAT TO HEAT WATER | $826 | $24,000 | Implemented |
OK0110 # 06 Y:1983 | 06 | 1983 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $343 | $80 | Implemented |
OK0110 # 07 Y:1983 | 07 | 1983 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $937 | $181 | Implemented |
GT0189 # 02 Y:1983 | 02 | 1983 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,754 | $1,000 | Implemented |
GT0190 # 03 Y:1983 | 03 | 1983 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,468 | $9,000 | Implemented |
GT0191 # 06 Y:1983 | 06 | 1983 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,700 | $4,500 | Implemented |
GT0195 # 01 Y:1983 | 01 | 1983 | INSULATE BARE EQUIPMENT | $1,500 | $530 | Implemented |
GT0195 # 02 Y:1983 | 02 | 1983 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $2,500 | $500 | Implemented |
GT0195 # 03 Y:1983 | 03 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,975 | $473 | Implemented |
GT0195 # 04 Y:1983 | 04 | 1983 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,900 | $4,730 | Implemented |
KU0102 # 02 Y:1983 | 02 | 1983 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,389 | $4,000 | Implemented |