IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,765

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0105 # 04 Y:1983 04 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,661 $167 Implemented
UD0106 # 01 Y:1983 01 1983 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,583 $4,300 Implemented
UD0106 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,363 $2,153 Implemented
TN0170 # 01 Y:1983 01 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,220 $15 Implemented
TN0170 # 02 Y:1983 02 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,840 $500 Implemented
TN0170 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $2,800 $7,000 Implemented
TN0170 # 04 Y:1983 04 1983 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $13,230 $4,000 Implemented
TN0180 # 01 Y:1983 01 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $21,000 $600 Implemented
TN0180 # 02 Y:1983 02 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $450 $100 Implemented
TN0180 # 03 Y:1983 03 1983 REDUCE VENTILATION AIR $3,500 $200 Implemented
TN0177 # 02 Y:1983 02 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,540 $400 Implemented
TN0177 # 03 Y:1983 03 1983 USE MINIMUM STEAM OPERATING PRESSURE $2,625 $400 Implemented
TN0179 # 01 Y:1983 01 1983 OPTIMIZE PLANT POWER FACTOR $8,400 $5,000 Implemented
TN0179 # 02 Y:1983 02 1983 INSULATE BARE EQUIPMENT $2,291 $5,700 Implemented
TN0179 # 03 Y:1983 03 1983 USE SOLAR HEAT TO HEAT WATER $826 $24,000 Implemented
OK0110 # 06 Y:1983 06 1983 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $343 $80 Implemented
OK0110 # 07 Y:1983 07 1983 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $937 $181 Implemented
GT0189 # 02 Y:1983 02 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,754 $1,000 Implemented
GT0190 # 03 Y:1983 03 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,468 $9,000 Implemented
GT0191 # 06 Y:1983 06 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,700 $4,500 Implemented
GT0195 # 01 Y:1983 01 1983 INSULATE BARE EQUIPMENT $1,500 $530 Implemented
GT0195 # 02 Y:1983 02 1983 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,500 $500 Implemented
GT0195 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,975 $473 Implemented
GT0195 # 04 Y:1983 04 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,900 $4,730 Implemented
KU0102 # 02 Y:1983 02 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,389 $4,000 Implemented